My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt02 Western States Surfacing
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2002
>
Agmt02 Western States Surfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 12:24:27 PM
Creation date
10/11/2002 10:34:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Western States Surfacing
PROJECT NAME
asphalt rubber chip seal 01-02
RMP File Number
304
Date
6/12/2002
MO Ref
02-141 02-212
Box
5941
Sticky Note
ID:
1
Text:
1 Agreement
9 - Faithful Performance Bond
14 Notice of Completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORlSINAl, <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California, hereinafter referred to as "City," and WESTERN STATES SURFACING, INC. <br />of Modesto, California, hereinafter referred to as "Contractor," for the consideration <br />hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform, within Ten (10) <br />calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />2001-2002 ASPHALT RUBBER CHIP SEAL PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the Manager, Engineering and Construction of <br />Redwood City, which Documents are incorporated herein and made a part of this <br />Agreement as if herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount Four Hundred Sixteen <br />Thousand Eight Hundred Thirty-two and 82/100 Dollars ($416,832.82), computed <br />in accordance with Contractor's accepted Proposal dated, May 21, 2002, which <br />accepted Proposal is incorporated herein by reference thereto as if herein fully set <br />forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and <br />to the approval of, City or its authorized representative, and the work shall be done <br />in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California labor Code relating to working hours. Contractor shall, <br />as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each <br />worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than eight (8) hours in anyone (1) calendar day and 40 <br />hours in anyone (1) calendar week, unless such worker receives compensation <br />for all hours Worked in excess of eight (8) hours at not less than 1-1/2 times the <br />basic rate of pay. <br /> <br />(b) Pursuant to the provision of California labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California labor Code Section 1773.2, Contractor is hereby advised that copies <br />of the prevailing rate of per diem wages and a general prevailing rate for <br />holidays, Saturdays and Sundays and overtime work in the locality in which the <br />work is to be performed for each craft, classification, or type of worker required <br />to execute the Contract, are on file in the office of the City Clerk, which copies <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.