Laserfiche WebLink
EXHIBIT "A" <br /> <br />John Cahalan <br />L a n d s c a p e A r c h i t e c t Landscape Architecture <br /> Urban Planning & Design <br /> Environmental Planning <br /> <br /> January 4, 2002 <br /> (650) 780-7219 JAN 0 ? 2002 <br /> Fax (650) 780-7309 CITY OF REDWOOD CITY <br /> ENOINEERING & CONSTRUCTION <br /> <br /> Mr. Paul Willis, Associate Engineer <br /> Engineering & Construction <br /> 1017 Middlefield ROad <br /> P.O. Box 391 <br /> Redwood City, CA 94064-039i <br /> <br /> RE; Main/Maple/Middlefield & Broadway/Hopkins Intersection Improvements/Task <br /> Order Amendment #1 <br /> <br /> Dear Paul, <br /> <br /> As requested, the following is a breakdown of the services and fees for the additional <br /> work involved in the median revisions at Broadway and Hopkins and to prepare "record <br /> drawings" based on "marked-up" plans provided by the contractor. <br /> <br /> Plan Revisions: <br /> <br /> Civil Engineering: Revise demolition, paving <br /> and striping and layout plans for revised medians <br /> at Broadway and Hopkins based on faxed sketch <br /> provided by staff. $900 <br /> <br /> Landscape Plans: Revise site construction, irrigation <br /> and planting plans for revised medians at Broadway <br /> and Hopkins based on faxed sketch provided by staff <br /> and delete backflow enclosure. $850 <br /> <br /> Subtotal $1,750 <br /> Reimbursable expenses $250 <br /> <br /> Total $2,000 <br /> <br /> 15495 Los Gatos Bivd,, Suite 5 ,, Los Gatos, California 95032 = (408) 358-5122 ,, Fax (408) 358-5133 = CA Reg, No, 2894 <br /> jcahalan@JPS,net <br /> <br /> <br />