My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord00 2191
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2000
>
Ord00 2191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:58:35 PM
Creation date
10/11/2002 12:30:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
4/24/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/24/00 <br /> that the mixeo._~e Development will generate less ,ftc than the sum of <br /> <br /> the individual land uses, the Applicant may submit an Independent Trip <br /> Generation Calculation Study as set forth in subdivision B of this Section. <br /> The Administrator shall determine the trip generation taking into <br /> consideration the Independent Trip Generation Calculation Study.. <br />B. Independent Trip Generation Calculation: <br /> <br /> 1. If a Development is for a land use not expressly described in the Impact <br /> Fee Schedule, or an Impact Fee is not clearly ascertainable by reference <br /> to said schedule, the Administrator shall select the Impact Fee for the <br /> most heady comparable type of land use specified in said schedule. The <br /> Administrator shall be guided in the selection of a comparable type by the <br /> 'q'rip Generation Manual," published by the Institute of Transportation <br /> Engineers (latest edition). If the Administrator determines that there is no <br /> comparable land use category in said Manual, the Applicant may submit <br /> an Independent Trip Generation Calculation Study of PM Peak Hour Tdp <br /> Generation Rates using a technically and statistically sound methodology <br /> (e.g., traffic counts for similarly situated and comparable land uses) <br /> prepared by a traffic engineer approved by the Administrator. An <br /> Independent Trip Generation Calculation Study shall be subject to the <br /> approval of by the Administrator. After such approval, the Administrator <br /> shall determine the Impact Fee by: <br /> <br /> Sh/Council/Ord ]. 5 <br /> Ord-105 <br /> FXS/ss <br /> 03/28/00 <br /> DES:rg:04/13/OOR; O4/17/0OR <br /> <br /> 2191 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.