My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 The Kastrop Group, Inc. - Architectural Design Services
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 The Kastrop Group, Inc. - Architectural Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 11:15:27 AM
Creation date
11/13/2006 11:03:36 AM
Metadata
Fields
Template:
Agreement
Contractor Name
The Kastrop Group, Inc.
PROJECT NAME
Architectural Design Services
RMP File Number
304.5
Date
11/9/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />SCOPE OF SERVICES <br /> <br />SCOPE OF WORK <br /> <br />Scope of work includes schematic design and construction documents for the following: <br />. Restoration and relocation of water tower with windmill pump to Union Cemetery. <br />. Design new base support building based on photographs of original. <br /> <br />INTENT AND EXTENT OF BASIC SERVICES <br /> <br />PHASE ONE & TWO <br /> <br />1.1 EC Existing Conditions: The Kastrop Group, Inc. will provide a site visit to verify measurements of <br />the existing building and photograph to document areas of work. Using these measurements, our staff will <br />draw the existing floor plan in CAD. Estimate: $500 <br /> <br />1.2 SD Schematic Design: The Kastrop Group, Inc. will meet with the Client to review the design <br />parameters and goals. We will develop up to two preliminary designs. These preliminary designs <br />consisting of hand-drawn sketches of floor plans and elevations will be presented for the Client's review <br />and approval. Tasks include: <br /> <br />. Hold one design meeting with the City's design team and end-user. <br /> <br />. Verify design goals and tasks. <br /> <br />. Design up to two solutions for restoration of water tower. <br /> <br />. Review building upgrades and remodeling required by code. <br /> <br />Estimate: <br /> <br />$2,000 <br /> <br />2.1 CD Construction Documents: Using the approved design, The Kastrop Group, Inc. will proceed to <br />produce construction documents as required to obtain a building permit and get final bids. <br />Estimate: $2,700 <br /> <br />ADDITIONAL COSTS: Eight person-hour(s) are budgeted for meetings with the City. If additional <br />meetings are required, they will be billed on an hourly basis according to current rates. Consultants are <br />not included in this contract. When professional consulting becomes necessary to the project, the Client <br />will be notified for approval, and consultant fees will be billed as a reimbursable charge. <br /> <br />FEE ARRANGEMENT: Compensation shall be on an hourly basis according to current rates listed on the <br />attached EXHIBIT "B", plus reimbursables for each phase described above. The fee for phases 1 and 2 <br />(not including reimbursables) is estimated to be: Five Thousand Two hundred Dollars $5,200 <br /> <br />Agreement under $10K <br />City Attorney Approved Version 111803 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.