My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord65 1195
RedwoodCity
>
City Clerk
>
Ordinances
>
1960-1969 partial
>
1965
>
Ord65 1195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 12:21:10 PM
Creation date
11/14/2006 4:01:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
5/24/1965
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />provided both of the following conditions are met: <br />II I (l) The bottom of the water service pipe, at <br /> <br />all points, shall be at least l2 inches above the top <br />of the sewer line. <br /> <br />II I (2) The water service pipe shall be placed on <br /> <br />a solid shelf excavated at one side of the common trench. <br /> <br />"' (c) Water piping installed within a building <br /> <br />and in or under a concrete floor slab resting on the <br /> <br />ground shall be installed in accordance with the fol- <br /> <br />lowing requirements: <br /> <br />III (1) Ferrous piping shall have a protective <br />coating of an approved type, machine applied and con- <br /> <br />forming to recognized standards. Field wrapping shall <br /> <br />provide equivalent protection and is restricted to <br /> <br />those short sections and fittings necessarily stripped <br /> <br />for threading. Zinc coating (galvanizing) shall not <br />be deemed adequate protection for piping or fittings. <br /> <br />Approved non-ferrous piping need not be wrapped. <br />o <br /> <br />.. I (2) Copper tubing shall be installed without <br /> <br />joints where possible. Where joints are permitted, <br /> <br />they shall be soldered with 95.5 solder and fitting <br /> <br />shall be wrought copper. <br /> <br />II . (d) No water supply system or portion thereof, <br /> <br />shall be covered or concealed until it first has been <br /> <br />tested, inspected and approved. <br /> <br />II i (e) Before such approval, both hot and cold <br /> <br />water piping shall be subjected to a full working water <br /> <br />pressure test from the street main or other source of <br /> <br />supply, or to an air pressure of not less than 50 pounds <br />per square inch for not less than l5 minutes. Piping <br /> <br />-l8- <br /> <br />.,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.