My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-12-04
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 10:20:08 AM
Creation date
11/30/2006 4:10:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council & Redevelopment
Date
12/4/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.2C <br />Redevelopment Agency of Redwood CiryPage 10 <br />Contract # <br /> <br />Page 3 <br /> <br />Task 5: Community Workshop and Stakeholder Meeting #2 <br />Task 5.1: <br />. Consultant will present draft results of the Technical Memorandum #1 Needs Assessment <br />Study <br />Task 5.2: <br />. Consultants with help from translator will present streetscape and pedestrian bridge <br />improvement options, including draft conceptual designs based on input from <br />Community Workshop # 1 for review and additional input <br />Task 5.3: <br />. Staff and consultant will communicate the results of meeting #2 to Caltrans for input and <br />next steps. <br /> <br />Deliverable <br />. Technical Memorandum #1 <br />Public In ut <br />Caltrans in ut <br /> <br />Documentation <br />Co of memorandum <br />List of attendees and meetin minutes <br />Meetin minutes <br /> <br />Task 6: Community Workshop and Stakeholder Meeting #3 <br />Task 6.1: <br />. Consultant with help from Redwood City and translator will present detailed plans, <br />including identification of projects to create safe walking and biking on and near the <br />pedestrian bridge, cost estimates, and funding options <br />Task 6.2: <br />. The community and stakeholders will provide comments to the plan, which will be <br />incorporated into the final report. <br /> <br />Deliverable Documentation <br />Draft implementation plan, conceptual Copy of draft plan and list of attendees <br />designs, and cost estimates <br />Public Input Meeting minutes <br /> <br />D. ANALYSIS <br /> <br />Task 7: Needs Assessment Study <br />Task 7.1: <br />. Consultant will inventory physical characteristics of roadway conditions, develop <br />criteria and methodology for collection and analysis, study the neighborhood and land <br />use characteristics, analyze data and documents, and develop conceptual designs. <br /> <br />Deliverable <br />Technical Memorandum #1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.