Laserfiche WebLink
<br /> <br />JOHN CAHALAN <br />LANDSCAPE ARCHITECT <br /> <br />DESCRIPTION AND <br />SCHEDULE OF DELlVERABLES <br />November 10, 2006: <br /> <br />Description of Deliverables: <br /> <br />Phase 1: The deliverables under Phase 1 services will include: Horticultural lab <br />analysis of native topsoil, photo-boards, a draft Preliminary Design/Scope Verification <br />Plan, and an estimate of probable construction costs. See Scope of Services dated <br />November 10, 2006 for a more detailed description. <br /> <br />Phase 2: The deliverables under Phase 2 services will include: Construction <br />documents and specifications (technical sections only) in the form of 70%,95% and <br />100% submittals and a final estimate of probable construction costs. See Scope of <br />Services dated November 10, 2006 for a more detailed description. <br /> <br />Schedule of Deliverables: <br /> <br />Contract finalized <br /> <br />November 20,2006 <br /> <br />Preliminary Design/Scope Verification Plan <br /> <br />November 27 <br /> <br />70% complete Plans, Specifications and Estimate <br /> <br />December 19 <br /> <br />95% complete Plans, Specifications and Estimate <br /> <br />January 9, 2007 <br /> <br />100% complete Plans, Specifications and Estimate <br /> <br />January 16 <br /> <br />15495 Los Gatos Boulevard <br />Suite 5 <br />Los Gatos CA 95032 <br />T 408-358-5122 <br />F 408-358-5133 <br />jcahalan@jps.net <br />CA Reg. No. 2894 <br />