My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-12-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-12-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2006 1:39:32 PM
Creation date
12/7/2006 1:30:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council & Redevelopment
Date
12/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />Page 2 <br /> <br />Due to the unsatisfactory and uncompetitive bids that were received, City Council, on <br />September 25, 2006, rejected all bids and authorized re-advertising using the <br />conventional bidding method of soliciting lump sum bids from general contractors. <br /> <br />Five bids were received on November 15, 2006, with the apparent low bid from Sasual <br />Corporation being 26% above the budget estimate of $11,500,000. After review of the <br />bids and verification of the low bidder's qualifications, staff believes that the bids are <br />responsive and recommends awarding the contract to Sausal Corporation. The new <br />low bid combined with the cost of construction management represents a savings of <br />approximately $1.6 million in comparison with the multi-trade bids received on July 20, <br />2006. <br /> <br />However, a shortfall of $3,030,000.00 remains and requires City Council Action. The <br />following funding sources have identified to support the additional needs: <br /> <br />1. Unreserved Fund Balance in General Fund (of which <br />$440,000 is from Transfer tax from commercial property sale) $2,564,000.00 <br /> <br />2. Anticipated savings from Library Operating Budget <br />In FY 07-D8 (Library will open in FY 08-09) <br /> <br />466.000.00 <br />$3,030,000.00 <br /> <br />T <br /> <br />he apparent low bids and alternatives are summarized below: <br /> Total with <br />No. Bidder Base Bid Alternate <br />1. Sausal COI'Doration - San Leandro CA $14.270.000 $14.472.500 <br />2. S.J. Amoroso Construction, Co. - Redwood City, $14,857,000 $15,244,000 <br /> CA <br />3. Ralph Larsen & Sons - San Mateo. CA $14,996,000 $15,269000 <br />4. Westbay Builders - Novato. CA $15.190000 $15.242000 <br />5. BRCO - Loomis CA $15898.000 $16.508 000 <br /> Engineer's Estimate - $11,300,000.00 <br /> <br />Alternatives <br />Council could direct staff to redesign this facility and reduce scope by reducing the size <br />of the Library, with the goal of reducing costs. However, this action woulg require <br />recertification from the State for changing the Library Program. <br /> <br />Fiscal Impacts <br />Currently, the account has a balance of $13,800,000 available in the Capital <br />Improvement Program Budget from the Capital Projects Fund and the GID 1--64 <br />Facilities Fee Fund. An additional $3,030,000 is required for awarding the construction <br /> <br />Page 2 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.