<br /> <br />EXHIBIT "A" <br /> <br />October 27, 2006 <br /> <br />Mr. Phong Du, P.E., Senior Civil Engineer <br />Engineering & Construction <br />City of Redwood City <br />P.O. Box 391 <br />Redwood City, CA 94064 <br /> <br />RE: Proposal for Construction Management Services for <br />Redwood Shores Recycled Water Distribution System Project Bid Packages 3 & 4 <br /> <br />Dear Phong: <br /> <br />Thank you for the opportunity to propose to continue to perform construction management for <br />the Recycled Water system. As a resident, I am pleased to continue to work with you CSG will <br />use its same experienced team of engineers, inspectors and sub-consultants to support the <br />City's efforts as it used for bid packages 1 &2. <br /> <br />Per your request, CSG has developed the enclosed estimate of personnel and ancillary services <br />for the above referenced projects, based on our experience with the previous projects. CSG <br />has estimated durations and amounts of effort for start-up activities, services during <br />construction, project coordination, testing and closeout services to be nearly the same as for the <br />previous projects. We expect that each project will need full-time inspection during most of its <br />duration, but that latter effort and closeout might offer opportunities for savings, as reflected in a <br />condensed schedule and reduced effort shown near the project's completion anticipated at the <br />end of 2007. The attached spreadsheets shows our estimates of services, hourly or itemized <br />rates and resulting project budget. <br /> <br />Rates are kept the same as currently charged for all engineering personnel, at the City's <br />request. However, due to increased costs for transportation and support personnel, we have <br />adjusted the rates for inspection and clerical staff. Our proposal for $892,414 is on a time and <br />materials basis and CSG will continue to work diligently to use only the amount of services <br />deemed necessary to properly perform work in a professional manner. We are pleased to note <br />that our efforts on BP3 are nearly complete and that they are on track to come in about 10% <br />below our estimate while we deliver these vitally needed projects for residents' benefit. <br /> <br />Should you have any questions or need any additional information please do not hesitate to <br />C04rz:; 522-2504. <br /> <br /> <br />Gordon Siebert, P.E. <br />Vice President, Operations <br /> <br />Enc: Spreadsheet estimates, BP 3 & 4 <br /> <br />1700 South Amphlett Boulevard, 3" Floor; San Mateo, CA 94402 <br />Phone: 650-522-2500; Fax 650-522-2599 <br />Email: csgstaff@csgengr.com; Online at www.csgwebsite.com <br />