My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res98 13471
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1990-1999
>
1998
>
Res98 13471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 3:04:23 PM
Creation date
10/21/2002 12:00:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
10/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(d) flow of water through the creek in its present condition continues to <br /> impede creek flow and will further erode the creek bed and endanger the <br /> health and safety of residents, and private and public property in the <br /> coming wet-weather season; <br /> <br />(e) said California Department of Fish and Game permit requires that the <br /> work to removal of dirt and debris shall be substantially complete by <br /> October 15, 1998; <br /> <br />(t') the emergency created by the time restriction imposed by said permit will <br /> not allow a delay resulting from the competitive advertisement or <br /> solicitation for bids, and the action hereinafter authorized is necessary to <br /> respond to the emergency; <br /> <br />(g) the public interest and necessity demand the immediate expenditure of <br /> <br /> public monies to safeguard life, health and property in order to alleviate <br /> the emergency condition described hereinabove. <br /> 2. Emerl:lenc¥ Authorization. The City Manager is hereby authorized <br /> <br />and directed to enter into and execute a contract and/or other documents (all in <br />form approved by the City Attorney) with $.G. Barber Construction Company for <br />the removal of dirt and debris from three box culverts at Industrial Way; the <br />dredging of two sumps, removal of sediment buildup in the creek bed; and for <br />the fabrication of equipment by the contractor to perform the work; without <br />soliciting or advertising for bids or receiving the same; provided, that the <br /> <br />Reso-516 2 <br />G:~shared'~redwood~ou ncil <br />FXS:djk 13 4 71 <br />09/~/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.