My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-01-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 11:08:52 AM
Creation date
1/18/2007 11:30:19 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.28 <br />Page 2 <br /> <br />5. After approval of the construction drawings by the San Mateo County Building <br />Department and upon application for new water service, property owner shall pay <br />all applicable Redwood City fees, including connection fees, and construction <br />costs associated with providing proposed water service extension. <br /> <br />Alternative <br />Council may withhold approval of application resulting in the denial of water connection <br />and service to a newly subdivided lot and a continuation of an unmitigated safety <br />hazard. <br /> <br />Fiscal Impact <br />There is no fiscal impact to the City. <br /> <br /> <br />t~~V~~ <br /> <br />Assistant Engineer <br /> <br /> <br /> <br />Peter Ingram ~ <br />Community Development Director <br /> <br />Chu Chang, P.E. <br />Manager, Engineering & Construction <br /> <br />~-- <br /> <br />Ed Everett <br />City Manager <br /> <br />Attachment <br />Draft Resolution <br /> <br />JS:ce <br />sllibrary/reports/Javier/Water Connection Service_1512 Edgewood <br /> <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.