Laserfiche WebLink
costs. <br />9. Construction Encroachment Permit and Fees; Trench Cut Fees; Inspector. <br /> <br /> (a) Level 3 shall apply for a project specific Encroachment Permit for all work within <br /> <br />the Public Right-of-Way and any other regulatory permits. Level 3 shall furnish detailed plans of <br />the work and other such information as required by the Director, including a detailed map <br />showing the layout of the proposed facilities and all existing facilities located in or immediately <br />adjacent to the area subject to the Encroachment Permit, and shall pay or deposit with City all <br />applicable costs such as processing fees, field marking, plan review, engineering and inspection <br />fees related to the proposed work, and City's actual legal fees for the preparation of this <br />Agreement, prior to issuance of permit (or subsequent to work being performed in the case of <br />costs or expenses not covered by a deposit) in accordance with the rates in effect at the time <br />when work is performed. Said improvements shall be constructed and installed in accordance <br />with Chapter 29 of the Redwood City Municipal Code, as amended from time to time, street <br />opening permit general conditions and any specific Encroachment Permit requirements, and as <br />further provided in this Agreement. <br /> <br /> (b) The Encroachment Permit shall set forth the description of the Fiber Optic <br />Network Facilities to be installed and the Public Right-of-Way on which such facilities are to be <br />located. In addition to the requirements set forth in Chapter 29 of the Redwood City Municipal <br />Code street opening permit general conditions, City will establish reasonable construction- <br />related conditions and specifications, and these shall also be set forth in the Encroachment <br />Permit. Level 3 shall utilize contractors licensed in the State of California to accomplish any <br />work. Level 3 and any of its agents working in the City shall obtain a current City business <br />license. Upon the completion of construction work, Level 3 promptly shall furnish to City <br />accurate plans and record drawings showing in detail, the exact location, depth, and size of the <br />Facilities in the Public Right-of-Way, including, without limitation, the profiles of all street <br /> <br /> F:Atty/Agr. 076 11 <br /> 100702 <br /> <br /> <br />