Laserfiche WebLink
Coastal Zone Management Act A Determination: p ' <br /> [Sections 307 (c), (d)] The project does not involve placement, e�e���f � <br /> removal of materials,nor an increase in the intensity of <br /> use in a Coastal Zone (CZ) per certified local costal <br /> plan,California Coastal Commission, SFBCDC <br /> Compliance Documentation: <br /> A1 A2,B1,B5,E26,F1,F4 <br /> Sole Saurce Aquifers A Determination: <br /> [40 CFR 149] The project is not located within a U.S. EPA — <br /> designated sole source aquifer watershed area per EPA <br /> Ground Water Office. <br /> Cornpliance Documentation: <br /> A1,A2,E8 <br /> Endangered Species Act A Determination: <br /> [50 CFR 402) The project is located within an already developed site <br /> and located within an Urban area. No naturaI habitat is <br /> present that wou(d sustain endangered plants or <br /> animals. Therefore the proposed activity will have"no <br /> effect" or "is not likely to adversely effect" any <br /> federalIy protected (listed or proposed) Threatened or <br /> Endangered Species nor adversely modify critical <br /> l�abitat. <br /> Compliance Documentation: <br /> A1,A2,Bl,D1,E11,D8 <br /> Wild and Scenic Rivers Act A Determination: <br /> [Sectlons 7(b),and (c)J The project is not located within one mi.le of a listed <br /> Wild or Scenic River. No Wiid & Scenic Rivers are <br /> located in San Mateo Co. <br /> Compliance Documentation: <br /> A1,A2,B1,E24 <br /> Clean Air Act — [Sections 1�6 (c), A Determination: <br /> (d),and 40 CFR 6, 51, 93] The project is located within San Mateo Co. and <br /> "Attainment" area. In addition the arnount of <br /> automobile exhaust generated by the project is below <br /> the threshold of significance developed by the Bay <br /> Area Air Quality Management District (BAAQMD) <br /> (530 units). Table page 24 —No asbestos removal is <br /> anticipated. <br /> Compliance Documentation: <br /> A1,A2,C2,E17 <br /> ,+. <br /> _. <br />