My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res98 13308
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1990-1999
>
1998
>
Res98 13308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 3:02:56 PM
Creation date
11/14/2002 11:12:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Thousand Four Hundred and No/100 Dollars ($24,400.00). Said bond or deposit <br />shall be effective for a period of two (2) years after acceptance of the <br />Improvements by City's Council. <br /> <br /> 3. Before the acceptance of the Improvements by City, Owner shall <br />dedicate by Grant Deed acceptable to the City Attorney's office, easements in, <br />on, under and above the water line, service line, and meters. <br /> <br /> 4. Those certain plans entitled, "Westport Office Park Phase 2 Public <br />Facilities Water System," prepared by Bohley/Maley Associates, as well as the <br />City's specifications entitled, "Engineering Standards -- City of Redwood City, <br />Volumes I, II, and II1," which plans and specifications are on file in the office of <br />the City Engineer are hereby approved and adopted as the plans and <br />specifications according to which the above-mentioned improvements shall be <br />constructed. <br /> <br />F:~shared\Redwood\Council\ 3 <br />FXS:ss 13308 <br />03/17/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.