Laserfiche WebLink
Historic Courthouse Reconstruction 11/4/02 <br />Comparison of Options per Construction of Fa{;ade <br /> <br />Existing Option A Option B Option C <br />colusa sandstone colusa sandstone GFRC FRP <br />copper cornice copper copper FRP <br /> <br />basic facade cost Note I 399,432 983,158 <br />additional costs 874,180 879,662 265,040 <br />total cost pending 1,279,094 1,248,198 <br /> <br />relative cost good better best <br />rank 3 2 1 <br />weight per seismic high moderate lightest <br />rank 3 2 1 <br />match existing stone contrast 'cos new good excellent <br />rank 2 3 1 <br />match existing copper contrast 'cos new contrast 'cos new excellent <br />rank 2 2 1 <br />constructability good better best <br />rank 3 2 1 <br />avoid joints in column shaft no no yes <br />rank 2 2 1 <br />reliable material source not confirmed yes yes <br />rank 2 1 1 <br />longevity good better best <br />rank 3 2 1 <br /> <br />SCORE 20 16 8 <br />rank good better best <br /> <br /> NOTES: <br /> 1. Stone Cost: Not available as of this date, therefore cost of this option is incomplete. <br /> 2, Score: The lower the score, like golf, the better. <br /> <br />D---S ~,rchi~cts + -'ngineers <br /> <br /> <br />