My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-11-18
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-11-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:54:38 PM
Creation date
11/14/2002 4:03:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hathaway <br /> Dinwiddie <br /> <br />SAN MATEO COUNTY HISTORIC COURll'IOUSE RESTORATION <br />Sehema~c Setlmete <br />September 19, 2002 Fh, ogre*e PrtnUng <br />COST <br />CODE DESCRIPTION SITE WORK <br />01250 PRE-CONSTRUCTION $ 27.000 <br />01260 PRE-CONSTRUCTION INVESTIGATIVE WORK $ 30,000 <br />~1291 SITE SERVICES $ 141.486 <br />020E,0 DEMOLITION $ 484.464 <br />02070 SELECTIVE DEMOLITION $ 6,840 <br />02200 SITE EARTHWORK $ 147,734 <br />02550 SITE CONCRETE $ 11,976 <br />02700 SITE DRAINAGE $ 15,560 <br />03190 FORMWORK $ 141,729 <br />03200 REINFORCING STEEL $ 48,919 <br />03300 CAST-IN-PLACE CONCRETE $ 48,360 <br />03450 ARCHITEC~rURAL CAST SYSTEM $ 983,185 <br />04400 STONE WORK $ 140,900 <br />05120 STRUCTURAL STEEL $ 111,609 <br />055~0 METAL FABRICATION $ 74.940 <br />05700 ORNAMENTAL IRON $ 37,591 <br />06100 ROUGH CARPENTRY $ 32.056 <br />~7100 WATERPROOFING $ 31,500 <br />07500 MEMBRANE ROOFING $ 20,730 <br />07600 ARCHITECTURAL SHEET METAL $ 55,350 <br />08701 FRAMES DOORS AND HARDWARE $ 32,500 <br />08800 GLAZING $ 42,500 <br />09200 LATH AND PLASTER $ 23,630 <br />09250 GYPSUM WALL BOARD $ 13.776 <br />09500 ACOUSTIC CEILINGS $ 1.800 <br />09650 VINYL FLOOR COVERING $ 4,428 <br />09900 PAINTING $ 77,997 <br />14400 HANDICAP LIFT $ 51,000 <br />15300 ;FIRE PROTECTION $ 12,700 <br />15400 =LUMBING $ 33,225 <br />16100 ELECTRICAL $ 127,150 <br /> 3UBTOTAL $ 3,012,635 <br /> ALLOWANCES: I <br /> SUBTOTAL $ 3,012,635 <br /> HOISTING $ 198,760 <br /> SUBTOTAL $ 3.211,395 <br /> LIABILITY INSURANCE $ 24,085 <br /> BOND EXCLUDED <br /> BITE OVERHEAD AND FEE $ 512,104 <br /> CONTRACTORS ESTIMATE CONTINGENCY 10% $ 374,756 <br /> TOTAL I I $ 4,122,343 <br /> ADD ALTERNATES: <br /> 1. Clean the exterior facade $ 99,876 <br /> 2. Repair the sandstone ( based on 10% of total exposed facade $ 178,640 <br /> 3. Architectural finish allowance at the new portico basement $ 28,928 <br /> 4 Event lighting Option A $ 95.000 <br /> 5. Event lighting Option B $ 165.000 <br /> Total Add AItarnates 567,444 <br /> TOTAL PROJECT COST 4,689,786 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.