My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-02-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-02-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2007 10:40:39 AM
Creation date
2/22/2007 3:04:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment
Date
2/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />6.2A <br />Page 1 <br /> <br />fRBF'OfRT <br /> <br />February 26, 2007 <br /> <br />Subject <br />Final Acceptance, Historic Courthouse Reconstruction/Courthouse Square, Phases I <br />and II. <br /> <br />Recommendation <br />By motion, accept the Historic Courthouse Reconstruction and Courthouse Square <br />projects, Phase I and II. <br /> <br />Background <br />DPR Construction Inc., a Redwood City based company, was selected to provide <br />construction management/ general contracting services for Phase I and Phase \I of the <br />Historic Courthouse Reconstruction and Courthouse Square projects. <br /> <br />Phase I included the demolition and removal of the existing south annex (fiscal building) <br />and reconstruction of the original Courthouse entrance and portico. The Courthouse <br />was reconstructed to replicate its 1906 design under the guidance of plans produced by <br />DES Architects. The project incorporated the use of original materials such as Colusa <br />sandstone as well as modern materials such as fiber glass reinforced plastic (FRP). All <br />materials meet the Secretary of the Interior's standards for historic preservation and <br />provide an appearance which is authentic, yet structurally sound to modern building <br />standards. The City Council approved a final agreed price for Phase I "at risk" <br />construction management/general contractor services for $4,955,057 on March 14, <br />2005. <br /> <br />Phase II included the construction of a new Courthouse Square intended to be the heart <br />of Redwood City's downtown revitalization. This new area was created by the removal <br />of the south annex in Phase I. Plans were designed under the direction of Freedman <br />Tung & Bottomley ("FTB"). This new Courthouse Square includes two pavilions with <br />raised areas to accommodate four different vendors, fountain areas with seating walls, <br />benches, decorative lighting, an ornamental concrete medallion, and a new downtown <br />public restroom. The City Council approved the final agreed price for Phase II "at risk" <br />construction management/general contractor services for $5,410,291 which extended <br />and amended OPR's contract to a total of $10,365,348. <br /> <br />There are two custom light fixtures (pre-wired protected by boxes) at the front of the <br />square that will be installed by the week of March 5th. These fixtures have not been <br />paid for ($17,000), and the City will retain approximately $900,000 for an additional 45 <br />days after Council acceptance to cover any potential late claims. <br /> <br />L:\Restored Library\REPORTS\Paul\2007\Courthouse Acceptance 02.26.07 <br /> <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.