My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res85 9807
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1980-1989 partial
>
1985
>
Res85 9807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 8:34:57 AM
Creation date
2/26/2007 2:16:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
2/25/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e) The acquisition of landscaping and irrigation within the public <br />rights-of-way of Chesapeake Drive, Saginaw Drive, Penobscot Drive <br />and Galveston Drive. <br /> <br />f) The acquisition of surface and subsurface storm drainage facilities, <br />including mains, manholes with manhole frames and covers, <br />catchbasins, later~ls and drop inlets, sanitary sewer mains, <br />manholes with manhole frames and covers, laterals and cleanouts, <br />water mains, valves, tees, fittings, hydrants and services within <br />the following general alignments as shown upon that certain map <br />entitled "Seaport Centre Subdivision of Parcel A 'Amended Map' of <br />Parcel Map No. 82-l" filed in Volume ll2 of Subdivision Maps at <br />Page 6, San Mateo County Records: <br /> <br />l) along the soutbeily line of Lot 1 <br />2) along the easterly and southerly lines of Lot 2 <br /> <br />3) along the easterly line of Lot 4 <br /> <br />4) parallel to the southerly line of Lots 8 and 9, distant <br />northerly therefrom 44.12 feet <br /> <br />5) along the easterly line of Lot 9 <br /> <br />6) along the westerly line of Lot l2 from the hereinabove <br />storm drainage pump station to a point at the northerly <br />terminus of Saginaw Drive. <br /> <br />g) The acquisition of an emergency access easement and road including <br />clearing, grubbing, grading, fill, base, pavement and bollards, <br />across the lands of the Southern Pacific Transportation Company to <br />the easterly line of Lot lO as shown on the hereinabove described <br />Subdivision Map. <br /> <br />h) The acquisition of all lands, easements and rights of way and of all <br />work and improvements auxiliary to any of the above and necessary to <br />complete the same. <br /> <br />City of Redwood City <br />Seaport Centre A.D. <br />01/22/85 <br /> <br />(ii) <br />
The URL can be used to link to this page
Your browser does not support the video tag.