My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res85 9792
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1980-1989 partial
>
1985
>
Res85 9792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 8:34:30 AM
Creation date
2/26/2007 2:34:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
2/4/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "An <br /> <br />a) The acquisition of property necessary for the widening of Seaport <br />Boulevard from East Bayshore Road to the southerly boundary of the <br />property of the Ideal Basic Industries, Inc., the acquisition of <br />property necessary for the construction of a storm drainage <br />retention basin and pumping station along the easterly side of <br />Seaport Boulevard from Blomquist Street to Chesapeake Drive and the <br />improvement of Seaport Boulevard from East Bayshore Road to a point <br />400 feet, more or less, northerly of Seaport Court by clearing, <br />grubbing, excavation and grading and the construction therein of <br />base, pavement, curbs, gutters, sidewalks, medians, bike paths, <br />traffic control devices, street signs and pavement markings, <br />underground serviced street lighting facilities, surface and <br />subsurface storm drainage facilities, where required, the <br />modification to an existing sewage force main in Seaport Boulevard <br />together with the construction of additional sewage force main <br />facilities, the adjustment of existing service utility facilities to <br />finish grade, the undergrounding of existing overhead electrical <br />transmission and distribution facilities and communication <br />transmission and distribution facilities, the installation of <br />casings crossing under the railroad tracks of the Southern Pacific <br />Transportation Company together with the installation of necessary <br />electrical, natural gas, water, sanitary sewer, storm sewer and <br />telephone facilities therein, the construction of a traffic signal <br />system at the intersection of Chesapeake Drive and Seaport Boulevard <br />together with the construction of underground conduits and pull <br />boxes for future traffic signal systems at the intersections of <br />Seaport Boulevard with Blomquist Street and Seaport Court and the <br />installation of landscaping, including irrigation and sprinkler <br />systems, where required, from u.S. Highway 101 to a point 400 feet, <br />more or less, northerly of Seaport Court. <br /> <br />b) The construction of railroad crossing facilities at Seaport <br />Boulevard and Chesapeake Drive including crossing gates, lights, <br />standards, signing, striping and marking, and traffic signal <br />interconnect and preempt facilities including underground conduits <br />and pu11boxes. <br /> <br />c) The acquisition of all lands, easements and rights of way and the <br />performing of all work auxiliary to any of the above and necessary <br />to complete the same. <br /> <br />City of Redwood City <br />Seaport Boulevard A.D. <br />01/22/85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.