Laserfiche WebLink
<br />JCB:rb 8/23/84 <br /> <br />3. The Director of Public Works is hereby directed to <br /> <br />redesign the project including, but not limited to, taking into <br /> <br />consideration all possible savings which could result from the <br /> <br />redesign of the storm drainage system and designing environmental <br /> <br />mitigation measures required by the federal agencies <br /> <br />* <br /> <br />* <br /> <br />* <br /> <br />2 <br />