Laserfiche WebLink
<br />DCB:rks <br />DCB:rks <br />DCB:rks <br />DCB:sah <br /> <br />to Charley Brown's). The Project shall also <br /> <br />include necessary undergrounding of utilities and <br /> <br />any required acquisition of right-of-way or <br /> <br />relocation of facilities owned by P.G.& E. The <br /> <br />Project <br /> <br />shall <br /> <br />be <br /> <br />all <br /> <br />those <br /> <br />costs <br /> <br />costs <br /> <br />necessarily <br /> <br />incidental <br /> <br />public <br /> <br />work <br /> <br />to <br /> <br />a <br /> <br />construction project, including, but not limited <br /> <br />to, <br /> <br />engineering <br /> <br />contract <br /> <br />design, <br /> <br />and <br /> <br />administration, <br /> <br />actual <br /> <br />construction <br /> <br />inspection. <br /> <br />The proj ect shall include all items listed <br /> <br />on Exhibit "A", attached hereto and incorporated <br /> <br />herein by this reference, but the actual cost of <br /> <br />these items, as listed in Exhibit "A", shall not <br /> <br />be reimbursed to Seaport. <br /> <br />The Project shall not include the cost of <br /> <br />Traffic Signalization at the intersections of <br /> <br />Bloomquist Street and Seaport Court with Seaport <br /> <br />Boulevard, <br /> <br />but shall include all costs of <br /> <br />underground <br /> <br />preparation <br /> <br />conduit, <br /> <br />including <br /> <br />wiring, and related work for such traffic signal <br /> <br />and railroad crossing protection devices as <br /> <br />contained in those plans entitled "Reconstruction <br /> <br />of Seaport Boulevard Station 5 + 24.48 to Station <br /> <br />2 <br /> <br />7/05/84 <br />7/20/84R <br />7/23/84R <br />7/24/84R <br /> <br />and <br />