Laserfiche WebLink
~?1,'1F, ~ilil i 1~.'?L Fp,;, FIFi`iFy;_ _IFI i F f~ic'1CLE11[I .v ~~`_ =:III:I~~TE~= ~ ijil;_,+f}i°i4 <br />J~uary 1 s, 200 <br />Javier Sierra- Project ~ngineex <br />Community Development Services <br />Engineering & Canstruckion <br />Page 2 of 3 <br />- Base map topographic survey wi11 extend lOQ £eet past street intersections in <br />all directions, <br />- Survey statiotzing will be provided as recommended by the City. <br />- Contours will be indicated at a one-faot interval. <br />- Redwood City elevation datum will be used (as supplied by City) <br />PROJECT FEES AIriD 1Vl'AN-~~[TRS -The following personnel (with abbreviations) <br />will provide services far the project: <br />- Principal PR <br />- Two-Person Survey Cz'ew SC <br />- Project Surveyor 1'S <br />- Surveying Technician ST <br />- CA,Ia 1];ra#~er CAD <br />The following tasks will be required to provide the final plans. Below each task is an <br />estimate of the man-hours required for that task keyed to the personnel listed above. <br />- Right-of--way, bench mark, property line caordizxation <br />ST: $ hrs. <br />- 1?ield topographic surveying <br />SC: 112 hrs. <br />- Computer processing of field data into AutoCAD format and processing of <br />City Block Book information. <br />1~5: 16 hxs. <br />- AutoCAb drafting: <br />CAD: 132 hrs. <br />- Project management, quality co><ltrol, and plan checking. <br />PR: 12 hrs. <br />PS: 16 hrs. <br />The fee for our services will be $39,500.04 and is approximately itemized in the table <br />below. The fee is based upon the assumption that we will contract to survey 100% of <br />bath phases. <br />