My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />iDENTIFiED IMPACT RELATED MITIGATION MEASURE implementation Monitoring and Timing Signature Date <br /> Entt Verification Entf Re ulrements <br />air quality. This would represent a Water active demolition areas to <br />potentially signitrcant impact. control dust generation during <br /> demolition of structures and break- <br /> up of pavement. <br /> • Cover all trucks hauling demolition <br /> debris from the site. <br /> • Use dust proof chutes to Toad <br /> debris into trucks whenever <br /> feasible. <br /> During ap construction phases: <br /> ^ Water all active construction areas <br /> at least twice daily. <br /> • Water or cover stockpiles of debris, <br /> soil, sand, or other materials that <br /> can be blov/n by the wind. <br /> • Cover ail trucks hauling soil, sand, <br /> and other loose materials, or <br /> require all trucks to maintain at least <br /> iwo feet of freeboard. <br /> • Pave, applywaterthree times daily, <br /> or apply (non-toxic) soil stabilizers <br /> on all unpaved access roads, <br /> parking areas, and staging areas at <br /> cons#ruction sites. <br /> • Sweep daily (with water sweepers) <br /> all paved access roads, parking <br /> areas, and staging areas a# <br /> construe#ion sites. <br /> • Sweep streets daily (with water <br /> sweepers) if visible soil material Is <br /> carried onto adjacent public streets. <br /> • Hydroseed or apply (non••toxic) soil <br /> stabilizers to inactive construction <br /> areas (previously graded areas <br /> inactive for ten days or more). <br /> • Enclose, cover, water twice daily, or <br /> apply (non-toxic) soil binders to <br /> ex osed stock ices dirt sand, etc. . <br />-- r <br />~~ <br />-~ D <br />Page 28 U:IMy CocumentslDo4mtowr, Precise PiantCC staff reporfsl.CC 3.12.doc43.12.07 Exhitn7slAtfachment A mit. monrtoringchecklist 655.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.