My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORINt's VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Enti Verification Enti R uirements <br /> ^ that excavations v~ill be adequately <br /> sloped or shored in order to minimize <br /> ground movements. <br /> Implementation of these measures-- <br /> combined with conformance with standard <br /> Uniform Building Code, City of Redwood <br /> City, and other applicable regulations-- - <br /> would reduce the potential effects of ground <br /> shaicin to a less-than-si niticant level. <br />Impact 15-2: Soil Erosion and Mitigation 13-2. Require applicants for Individual City Condition of grading permit <br />Sedimentation. Under either the Maximum future development projects in the Precise project issuance; field verify <br />or Moderate Intensity Precise Plan Pian area involving a grading area of one applicants implementation during grading <br />alternative, grading for future developmenE in acre or greater to prepare erosion control and construction. <br />accordance with the proposed Precise Plan plans subject to City approval and <br />would temporarily disturb the site's existing consistent with the required proje:ck <br />topography and vegetative cover, leaving Stomtwater Pollution Prevention Plans <br />soils exposed to wind and water erosion {SW PPPs) as well as Best Management <br />during the construction period. Eroded soils Practices (BMPs) specified by the Redwood <br />could be washed into on-site or off-site City Stormwater Management and <br />drainage Faalities_ Resulting sedimentation Discharge Control Program (Municipal <br />could affect the flows in these drainage Code chapter 27A). Implement the plan <br />faalities, increasing Flooding potential and during construction. Erosion during all <br />maintenance problems and degrading water phases of construction shall be r~ntrolled <br />quality. These possible effects of soil erosion through the use of erosion and soil <br />represent a potentially significant impact. transport control facilities. These shall <br /> include the use of catch basins and filter <br /> fabrics, and the direction of stormwater <br /> runoff away from disturbed areas. The plan <br /> shall also provide for long-term stabilization <br /> and maintenance of remaining exposed <br /> soils after construction is completed. Areas <br /> disturbed by construction shall be either <br /> covered witty impervious surfaces (e.g., <br /> buildings and pavement) or fully stabilized <br /> with landscaping andfor native vegetation. <br /> All revegetated areas shall be Irrigated and <br /> maintained as necessary to ensure the <br /> long-term survival of the vegetation. <br /> Implementation of this measure would <br /> reduce this potential impact to a less-than- <br /> si nificant level. <br />N <br />CQ <br />(D <br />OD ~ <br />Page 35 U:1My DocumertslDowntown Precise PlantCC staff reportslCC 3.12.doo13.12.07 ExhibrtslAttachment A mit.monitoring checkAst 655.d~ D <br />
The URL can be used to link to this page
Your browser does not support the video tag.