Laserfiche WebLink
ATTACHMENT G <br />DRAFT DOWNTOWN PRECISE PLAN <br />ISSUE MATRIX <br /> <br /> <br /> Need to better address Precise Plan requires aone-to-one No change. Precise Plan No change. Approve <br /> transitional height between height-to-setback ratio in order to adequately addresses building heights as <br />4 residential buildings on Arch keep an appropriate heighf issue. proposed in the <br /> Street and rear of commercial relationship between the two Downtown Precise Plan <br /> buildings fronting EI Camino Real structures. This is adequate to This retains appropriate <br /> (verbal comments on 10/3/06 and respect the height transition. Refer transitional height along <br /> written comments on 1016!06) to 2.2.6 in the Precise Plan EI Camino Real, with <br /> (Relation to Single Family Homes) height step backs. <br /> f <br />Reduce the maximum height in <br />Maximum height is not the defining <br />No change. Maximum <br />No change. Approve <br />5 the downtown from twelve stories issue for the downtown as some height allowed on building heights as <br /> to eight stories maximum. (16) developers will not want to build oi° certain blocks is proposed in the <br /> be able to build up to the maximum recommended to be Downtown Precise Plan <br /> height because they will not be twelve stories. with a maximum height <br /> able to assemble the appropriate of 12 stories. <br /> parcels, not meet the parking <br /> requirements, and may have to <br /> meet the required height <br /> relationship to adjoining historic <br /> structures. "these facts will result in <br /> a varlet of sk line hei ht. The <br />v <br />cQ <br />m <br />oNO D <br />