6.1 C <br />Page 2 <br />first and second projects (Bid Packages 1 and 2) are 95% and 100% constructed, <br />respectively, and Bid Package 3 is under construction and scheduled for completion <br />by Fall of this year. <br />5. Customer site retrofits for each existing private or public site with a landscape <br />irrigation meter. Retrofits will occur as each property owner agrees to convert to <br />recycled water for landscape irrigation and industrial uses. Status: The first <br />Customer Site Retrofit package {Retrofit Bid Package 1) for 18 commercial sites in <br />the Redwood Shores area will be under construction for the 2007 irrigation season. <br />This pipeline construction project (Bid Package 4 -see attached map) is the fourth <br />distribution system project designed to extend and complete the delivery of recycled v~rater <br />to new commercial irrigation and Gity roadway landscape customers in Redwood Shores, <br />and connect to the completed U.S. 101-Bike Path Pipeline section. The completion of Bid <br />4 construction at the end of this year marks an important milestone in the Recycled Water <br />Transmission System component of the project as we bring recycled water services out of <br />Redwood Shores and move closer to delivering recycled water to the commercial and <br />industrial customers in the Bay Front and Seaport areas. The project consists of the <br />installation of the main transmission piping system in Redwood Shores along Redwood <br />Shores Parkway, Airport Way, Skyway Road, Twin Dolphin Drive, & Electronic Arts Drive. <br />More than 8,000 feet of PVC pipe ranging in size from 8 to 24 inches in diameter, will be <br />constructed in approximately eight months. <br />The 8 bids received at the bid opening on March 6, 2007, are summarized below: <br />No. Bidder Bid Amount <br />7. Shaw Pi eline, Inc., San Francisco $2,662,950.00 <br />2. K.J. Woods Construction, inc., San Francisco $2,674,000.00 <br />3. Ran er Pipelines, Inc., San Francisco $2;861,920.00 <br />4. Mitchel! En ineerin ,San Francisco $3,152,400.00 <br />5. Mountain Cascade, Inc., Livermore $3,249,695.00 <br />6. ARB, Inc., Lake Forest $3,459,246.00 <br />7. West Valle Construction, Inc. ,San Jose $3,971,595.00 <br />8. Pacific Under round Construction, Inc., San Jose $3,973,625.00 <br />The low bid of $2,662,950.00 from Shaw Pipeline, Inc. is 13% lower than the Engineer's <br />estimate of $3 Million for the cost of construction. Based upon the bids received, s#aff <br />believes that the low bid of $2,662,950.00 is reasonable and responsive, and recommends <br />awarding the contract to Shaw Pipeline, Inc. <br />Alternative <br />Do not award the contract for the Redwood City Recycled Water Project - Phase I - <br />Redwood Shores Distribution System -Bid Package 4 (Redwood Shores Parkway, Airport <br />Way, Skyway Road, Twin Dolphin Drive, & Electronic Arts Drive} Project, which would be <br />contrary to prior Council action. <br />Page2of3 <br />