My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 4:38:38 PM
Creation date
3/8/2007 2:32:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDENTIFIED IMPACT RELATED MITIGATION MEASURE Impiementation Monitoring and Timing Signature Date <br /> Enti Verification Enti Re utrements <br /> • Covering the site with a layer of <br /> chemically stab{e soil; or <br /> • Deeding the site into a permanent <br /> conservation easement. <br /> When in-place mitigation is determined by <br /> the City to be infeasible, a data recovery <br /> plan, which makes provisions for adequate <br /> recovery of the scientifically consequential <br /> information about the site, shall be <br /> prepared and adopted prior to any <br /> additional excavation being undertaken. <br /> Such studies must be submitted to the <br /> Ca-ifornia Historical Resources Regional <br /> Information Center (i.e., the NWIC at <br /> Sonoma State University). If Native <br /> American artifacts are involved, the studies <br /> must also be submitted to the Native <br /> American Heritage Commission. Identified <br /> cultural resources should be recorded on <br /> form DPR 422 (archaeological sites). <br /> Mitigation measures recommended by <br /> these two groups and required by the City <br /> shall be undertaken, if necessanr, prior to <br /> resumption of construction activities. <br /> A data recovery plan and data recovery <br /> shall not be required if the Ciry determines <br /> that testing or studies already completed <br /> have adequately recovered the necessary <br /> data, provided that the data have already <br /> been documented in another EIR and are <br /> available for review at the California <br /> Historical Resource Regional Information <br /> Center (CEQA Guidelines section <br /> 151?.fi.4[bj). <br /> in the event that subsurtace cultural <br /> resources are otherwise encountered <br /> during approved ground-disturbing activities <br /> for a Precise Plan area construction activity, <br /> work in the immediate vicinity shall be <br /> stopped and a qualified archaeelogist <br /> retained to evaluate the finds following the <br /> procedures described above. Project <br /> personnel should not collect cultural <br /> resources. Prehistoric resources include <br /> chert or obsidian flakes, r "ectile oints, <br /> m <br />rn~~ <br />Pages U:IMy 1~ocumenfslDowntown Precise PlantCC staff reportslCC 3.12.doc13.12.Q7 ExhibifslAtiachment A mN.monitoring checklist 655.doi<" D <br />
The URL can be used to link to this page
Your browser does not support the video tag.