My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2007 10:06:32 AM
Creation date
3/22/2007 1:36:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br />Page 35 <br />identified above in the interest of protecting the pedestrian environment. This <br />choice would result in a significant unavoidable <br />impacf under current CEQA and City criteria for "Intersection Impacts." <br />Findings: The City Council of the City of Redwood City finds this impact <br />to be significant and unavoidable. Mitigation measures 9-15(a), 9-15(b), and 9- <br />15(c) are infeasible because these mitigation measures may potentially degrade <br />the Downtown pedestrian environment and decrease pedestrian safety, comfort, <br />and convenience. Adoption of these proposed mitigation measures would be <br />inconsistent with existing and proposed City policies giving priority to the <br />Downtown pedestrian environment (see Section 9.1.1 of this FEIR chapter). The <br />City Council of the City of Redwood Gity chooses to avoid these three mitigation <br />options in the interest of protecting the pedestrian environment. This impact is <br />overridden by project benefits as set forth in the statement of overriding <br />consideration s and in the pedestrian priority objectives set froth in section 9.1.1 <br />of this FEIR chapter. <br />Impact 9-16: Project Contribution to Cumulative impacts at the <br />BroadwaylJefferson Avenue Intersection. During the PM peak hour, the <br />addition of project traffic would increase average delay by more than five (5) <br />seconds at this intersection, which would already be operating at LOS F. This <br />effect would represent a significant impact (see criteria for "intersection <br />Impacts," in subsection 9.4.1, "Significance Criteria," above.) <br />Mitigation 9-16. Adding an exclusive northbound left-turn lane on <br />Broadway and converting the existing northbound-shared left-through right lane <br />into a shared through/right-turn lane would result in improved LOS F operation <br />with less average delay than that experienced under Cumulative (Without <br />Prr~jert) Condi±inn~. Implemgntation of this mitigation would therefore reduce ti~°~ <br />project impact to a less fhan-significant level. <br />or <br />Because this mitigation would result in the loss of sidewalk at corner bulb- <br />outs, degrading the existing and future pedestrian environment and sidewalk <br />dining opportunities, and would be inconsistent with City policies giving priority to <br />the Downtown pedestrian environment (see section 9.1.1 of this chapter}, the <br />City may choose to avoid this intersection modification in the interest of <br />protecting the pedestrian environment. This choice would result in a significant <br />unavoidable impact based on current CEQA and City criteria for "Intersection <br />Impacts." <br />Findings: The City Council of the City of Redwood City finds this impact <br />to be significant and unavoidable. Mitigation measure 9-6 is infeasible because <br />this mitigation measure would result in the Loss of sidewalk at corner bulb-outs, <br />degrading the existing and future pedestrian environment and sidewalk dining <br />Atty/Reso/Reso.1683 ~ 5 <br />030707 <br />
The URL can be used to link to this page
Your browser does not support the video tag.