My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2007 10:06:32 AM
Creation date
3/22/2007 1:36:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br />Page 47 <br />conditions in individual project demolition and construction contractor agreements <br />that stipulate the following ground-borne vibration abatement measures: <br />• Restrict vibration-generating activity to between the hours of 7:00 AM and <br />7:00 PM, Monday through Friday. Prohibit such activity on weekends and <br />holidays. <br />Notify occupants of land uses located within 200 feet of pile-driving activities <br />of the project construction schedule in writing. <br />• Investigate in consultation with City staff possible pre-drilling of pile holes as a <br />means of minimizing the number of percussions required to seat the pile. <br />Finding: Implementation of these measures would reduce this potential <br />intermittent and short-term Precise Plan vibration impact to a less-than- <br />significantlevel. <br />{mpact 71-3: Potential Exposure of New, Precise Plan-Facilitated <br />Noise-Sensitive Development to Noise Levels Exceeding Standards. The <br />proposed Precise Plan would facilitate new residential development in downtown <br />Redwood City. Associated new residents, employees, and visitors could be <br />exposed to various existing and projected noise sources, including traffic and <br />Caltrain operations. The compatibility of the Draft Precise Pian proposed land <br />uses with the existing and projected noise environment has been evaluated <br />based on the <br />Redwood City Noise Guidelines for Land Use Planning (see EIR Table 11.4). <br />New residentia! development is considered normally acceptable in noise <br />environments of less than 55 dBA CNEL, and new commercial or retail <br />development is considered normally acceptable in noise environments of 70 dBA <br />CNEL or less. Future noise levels throughout much of the Precise Pian area, <br />especially in the vicinity of the Caltrain line, ~,rrould exceed bb dBA CNEL. Land <br />uses proposed within 250 feet of the Caltrain line, 120 feet from the centerline of <br />EI Camino Real, or 100 feet from Veterans Boulevard, would be exposed to <br />noise levels of 70 dBA CNEL or higher, thereby exposing new Precise Plan- <br />designated, noise-sensitive residential, commercial, recreational, and public <br />facility land use development to noise levels exceeding the "normally acceptable" <br />threshold. These possible long-term adverse noise effects would represent a <br />potentially significant impact. <br />Mitigation 11-3. Site-specific noise studies consistent with the <br />requirements of the State Building Code (SBC) shall be conducted for all new <br />Precise Plan-facilitated residential uses in these identified potential land <br />use/noise compatibility impact areas to identify appropriate noise reduction <br />measures to be included in project final design. Each noise study must be <br />submitted to and approved by the Redwood City Building Department prior to City <br />issuance of a residential building permit. identified noise insulation measures may <br />include: <br />Atty/Reso/Reso.1683 27 <br />030707 <br />
The URL can be used to link to this page
Your browser does not support the video tag.