My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-03-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-03-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2007 10:06:32 AM
Creation date
3/22/2007 1:36:25 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br />Page 15 <br />City...but not at the expense of the environment or the overall quality of life in <br />Redwood City or to the detriment of alternative transportation modes" (Motor <br />Vehicle Transp. Policy MV-2); and a policy calling for "making walking and <br />bicycling a realistic and more widespread transportation aiternative" by creating <br />"an urban environmental that will make walking and bicycling safe, efficient and <br />convenient" (Non-Motorized Transp. Objective NM-1 ). <br />In this light, the Draft Downtown Precise Plan specifically states, in the event of a <br />conflict between the needs of motor vehicles and pedestrians, "It is City policy <br />that pedestrian comfort, safety, convenience, and enjoyment have priority." <br />The Gity's commitment to these pedestrian priority objectives has been treated <br />as an overriding consideration in formulating the traffic impact and mitigation <br />findings of this EIR chapter. <br />5. Mitigation Monitoring and Reporting Program <br />The Mitigation and Monitoring and Reporting Program (the "MMRP") for the Downtown <br />Precise Plan Project is attached to this resolution as Exhibit B and is incorporated and <br />adopted as part of this resolution herein, and is included in the conditions of approval for <br />the Project. The MMRP identifies impacts of the Project, corresponding mitigation <br />measures, designation of responsibility for mitigation implementation and the agency <br />responsible for the monitoring action. The Project does not have potentially significant <br />adverse environmental effects which exceed or differ #rom those of the Initial Project, <br />and no additional, feasible mitigation measures are available or necessary for the <br />Project as modified from the Initial Project. <br />A. The mitigation measures set forth in the MMRP are specific and <br />enforceable and are Capable of be,ng fully ~mplcmented by the efforts of <br />Atty; Reso/Reso.1683 <br />030707 <br />
The URL can be used to link to this page
Your browser does not support the video tag.