My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2007
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 9:14:11 AM
Creation date
4/5/2007 9:06:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/27/2007 <br />Downtown pedestrian environment (see Section 9.1.1 of this FEIR chapter). The <br />City Council of the City of Redwood City chooses to avoid the intersection <br />modifications proposed by this mitigation measure in the interest of protecting the <br />pedestrian environment. This impact is overridden by project benefits as set <br />forth in the statement of overriding considerations and in the Pedestrian Priority <br />Objectives set forth in section 9.1.1 of this FEIR chapter. <br />Impact 9-5: Impact Broadway/Middlefield Road Intersection-- <br />Maximum <br />Intensity Precise Plan Alternative. During the PM peak hour, the Maximum <br />Intensity project traffic increment would reduce operation to LOS E and increase <br />average delay by more than five (5) seconds at the intersection of <br />Broadway/Middlefield Road. This change would represent a significant impact. <br />Mitigation 9-5. The intersection of Broadway/Middlefield Road is currently <br />a 4-way stop controlled facility. Signalizing the intersection (2-phase control) <br />would result in LOS B operations under Maximum Intensity conditions. <br />Implementation of this measure would result in ales-than-significant impact. <br />or <br />Because this mitigation action would be less supportive of pedestrian <br />convenience and orientation than the existing 4-way stop due to delays to <br />pedestrians waiting to cross during "walk" phases and higher vehicle speeds <br />through the intersection; would be inconsistent with City intentions for this <br />intersection to be pedestrian-oriented given its location in the Downtown core; <br />and would be inconsistent with the existing and proposed City policies giving <br />priority to the Downtown pedestrian environment (see section 9.1.1 of this <br />chapter), the City may choose to avoid this intersection modification in the <br />interest of protecting the pedestrian environment. This choice would result in a <br />significant unavoidable impact under current CEQA and City criteria for <br />"Intersection Impacts." <br />Findings: The City Council of the City of Redwood City finds this impact <br />to be significant and unavoidable. Mitigation measure 9-5 is infeasible because <br />this mitigation action would be less supportive of pedestrian convenience and <br />orientation than the existing 4-way stop due to delays to pedestrians waiting to <br />cross during "walk" phases and due to higher vehicle speeds through the <br />intersection. Mitigation measure 9-5 is infeasible because it would be <br />inconsistent with City intentions for this intersection to be pedestrian-oriented <br />given its location in the Downtown core. Furthermore, mitigation measure 9-5 is <br />incompatible with the existing and proposed City policies that seek to preserve <br />and enhance the Downtown pedestrian environment by ensuring pedestrian <br />safety, comfort, and convenience. Adoption of this proposed mitigation measure <br />would be inconsistent with existing and proposed City policies giving priority to <br />the Downtown pedestrian environment (see Section 9.1.1 of this FEIR chapter). <br />Atty/Reso/Reso.1683 7 14769 <br />030707 Muff #613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.