Laserfiche WebLink
p MONITORING VERIFICATION <br />'-. <br />tDEND IMPACT <br />RELATED MRIGATION MEASURE <br />Implementation <br />Monitoring and <br />Timing <br />Signature <br />Date <br /> Enti Verification Enti Re uirements <br />traffic estion on local roads, possibly In addition, require City review and <br />interferir~with emergency access and approval of proposed emergency access <br />respons~y the RCFD. These possible provisions prior to approval of individual <br />project cts on emergency access and in development projects in the Precise Plan <br />the Prece Plan area represent a potentially area. Requ'sre individual projects to comply <br />signific~f impact. with all applicable City of Redwood City <br />p road design and emergency access <br />W standards. The City may consider other <br /> alternatives to these requirements if it <br /> determines that such alternatives are <br /> feasible and such access will not jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce impacts on <br /> emergency access and response to a less- <br /> than-si nificant ieveJ. <br />Impact 10-6: Emergency Access and Mitigation 10,6. Implement mitigation City; individual City Condition of grading permit <br />Response Impacts--Moderate Intensity measures identified in chapter 9 project issuance; Held verify <br />Precise Pian Alternative. Traffic from (Transportation and Circulation} of the EiR applicants implementation during grading <br />potential development under the Moderate to reduce project-related traffic impacts on and construction. <br />Intensity alternative would create additional 1oca1 roads to less-than-significant levels. <br />Vaffic congestion on local roads, possibly In addition, require City review and <br />interfering with emergency access and approval of proposed emergency access <br />response by the RCFD. These possible provisions prim to approval of individual <br />project effects on emergency access and in development projects in the Precise Plan <br />the Precise Plan area represent a potentially area. Require individual projects to oomply <br />significant impact. with all applicable City of Redwood City <br /> road design and emergency access <br /> standards. The City may consider other <br /> alternatives to these requirements if it <br /> determines that such alternatives are <br /> feasible and such access will not jeopardize <br /> emergency response. Implementation of <br /> these measures would reduce impacts on <br /> emergency access and response to a tess- <br /> than-si nifrcant level. _.___ <br />NOSE <br />Impact 11-1: Precise Pian-Facilitated Mitigation 11-1. Reduce Precise Plan Individual City Condition of grading permit <br />Demolition and Construction Period Noise. <br />i <br />i implementation-related individual project <br />demolition-and construction-period noise project <br />applicants issuance; field verify <br />implementation during grading <br />i <br />es <br />t <br />Demolition and construction activ <br />faci~Sted by the Downtown Precse Plan impacts on nearby residences by and construction. ~ <br />coctd temporarily elevate noise levels at incorporating conditions in project t <br />near~y~esidential and commercial receptors demolition and construction contract - <br />du~~ roidual, site-specific project agreements that stipulate the following ~ <br />cori~on periods, Noise levels at 50 feet conventional construction-period noise c <br />~ <br />frorWt~E%jemoli6on or construction equipment abatement measures: <br />source could reach approximately 105 dBA, <br />Page 23 U:1My DocumentslDowrtorn Precise PiantCC stall ~eN~orfs1CC 3. f 2.doc13-12.07 ExhibBstAttachment A mit.monttorrng checklist 655.doc <br />