My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2000-2009
>
2007
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 9:14:11 AM
Creation date
4/5/2007 9:06:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br />IDEND IMPACT RELATED MITIGATION MEASURE implementation Monitoring and Timing Signature Date <br />v ~ Enti Verification Enfi Re uirements <br /> <br />v cD Temporary Barriers. Construct solid <br />N <br />O plywood fences around construction <br /> sites adjacent to residences, <br />~ <br />~ operational businesses, or noise- <br />~ sensitive land uses. <br />O <br />~ Temporaryl~oise Blankets. <br />w Temporary noise control blanket <br />w barriers should be erected, if <br /> necessary, along building facades of <br /> construction sites. This mitigation <br /> would only be necessary if conflicts <br /> occurced which were irresolvable by <br /> proper scheduling. (Noise control <br /> blanket barriers can be rented and <br /> quickly erected.) <br /> • Noise Disturbance Coordinator. For <br /> larger construction projects, the City <br /> may choose to require project <br /> designation of a "Noise Disturbance <br /> Coordinator" who would be <br /> responsible for responding to any <br /> local complaints about construction <br /> noise- The Disturbance Coordinator <br /> would determine the cause of the <br /> noise complaint (e.g., starting too <br /> early, bad muffler, etc.) and Institute <br /> reasonable measures to correct the <br /> problem. Conspicuously post a <br /> telephone number for the <br /> Disturbance Coordinator of the <br /> construction site and include it in the <br /> notice sent to neighbors regarding <br /> the construction schedule. (The <br /> project sponsor should be <br /> responsibte for designating a Noise <br /> Disturbance Coordinator, posting the <br /> phone number and providing <br /> construction schedule notices. The <br /> Noise Disturbance Coordinator would <br /> work directly with an assigned City <br />~ staff member.) <br />c <br />~~ <br />~ ~ <br />Implementation of these measures would <br />~ v reduce this intermittent, short-term project <br />~ ~ construction-period noise impacts to a less- <br />~''~ ~ than-slgnificantlevel. <br />Page zs UaMy DocumentslDowntown Precise PIanICC staff reporislCC 3.12_doc13.12.01 Exhibits~ABachme~t A mit mcniterrg checklist 855.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.