Laserfiche WebLink
__--- ---- <br /> ____.. . . _... _.._..__-----...-----.-._.._._ __._._,,._ ._._...�,_.__.__..w�_..,.,,...,_._..._.__........._.....__.._.:...9�,.. <br /> Page 66. <br /> ' Propnseri Developrnent at 21 Horgan Avenue/885 Woodside Rd., Redwood City, CA (330139} <br /> Apri12,2007 _ <br /> Page 2 <br /> Waste Mana�ement Flan , <br /> GPP staff approve the waste management plan with the following conditions: <br /> • Schedule the date and time of the drillin�;:of the soldier bean�borings and the excavation <br /> of soils>J 0 fbg with GPP.staff at least three business days in advance of the wark; <br /> • Periodically record pfiotoionization detector {PID) readings along the eastern property � <br /> line during tl�e drilling of tl�e soldier beam bozin�s and when excavating soils >10 fbg. <br /> Cease work if PID readings along the eastern property line exceed 100 parts per million <br /> (work can be resumed if engineering coi�trols reduce the`P�D readings along this , <br /> boundary to<50 parts ger million); . _ <br /> • Mininnize the generatian of dust; especially from soils excavated >l0 �bg, and analyze <br /> stackpiled soil in accordance with the receiving faciliries requireinents; <br /> a Notify GPP staff if hydrocarbons a�'e encountered during site excavation activities; <br /> ' • Do not generate runoff when wettirig soil stockpiles unless the runoff will be contained � <br /> ; and properly disposed; and <br /> • Backfil� the soldier �eam.bortngs �vith. Portland eeznent. grout when the shoring is <br /> j removed ta inhibit potential vertical migration of hydrocarbori-affected groundwater. . � <br /> Closin�Cornments <br /> Does Nichoison Larnb Venture plan to install capped piping under ihe basement slab to all�w <br /> potez�tial future conveyancc of vapor and/or groundwater to $95 Woodside Road? Such action <br /> should be cbnsidered and coordinated with the Responsible ;Party (RP) of the 845 Woodside <br /> Road site in case the RP aemonstrates extraction beneath the basement slab is necessary to reach <br /> -- remec�ial objec�ives A-tracer wire--siiauld�b�-in�'Ca�Ye�t�'�n-�his piping to-#acilitate-fii�i"zie loca"tian <br /> (do not stub the pipes up fihrough the basement slab). �t appears these pipes sliould. trend <br /> � perpendicular to the property line contacting 895 Woodside Road. In addition,it appears three to <br /> five, sets of piping are necessary (e.g. perhaps approximateJy 35 and 80 feet northeast of the <br /> elevator pit and approximately 65 feet soutlieast af the existing sidewalk along Woodside Road <br /> for a 3 set desig�). However, final desigri must be justified.by a State Registered Geologist and <br /> Civil Engineer experienced in environmental remediation matters. <br />