Laserfiche WebLink
<br />design and the means, methods, techniques, sequences or procedures of <br />construction to be employed by Contractor and safety precautions and <br />programs incident thereto. <br /> <br />B. Contractor has examined thoroughly and understood all reports of <br />exploration and tests of subsurface conditions, drawings or reports, available <br />for design and construction purposes, of physical conditions, or which may <br />be apparent at the Site and accepts the determination set forth in these <br />documents and Document 00700 (General Conditions) of the limited extent <br />of the information contained in these documents upon which the Contractor <br />may be entitled to rely. Contractor agrees that except for the information so <br />identified, Contractor does not and shall not rely on any other information <br />contained in these documents. <br /> <br />C. Contractor has considered the physical conditions at or contiguous to the <br />Site or otherwise which may affect the cost, progress, performance or <br />furnishing of Work, as Contractor considers necessary for the performance <br />or furnishing of Work at the Contract Sum, within the Contract Time and in <br />accordance with the other terms and conditions of Contract Documents, <br />including specifically the provisions of the General Conditions. <br /> <br />VI. CONTRACT DOCUMENTS <br /> <br />The Contract Documents which comprise the entire agreement between City and <br />Contractor concerning the Work consist of the following: <br /> <br />A. Contract Documents consist of the following documents, including all <br />changes, addenda and modifications thereto, as listed on Table of Contents: <br /> <br />Section 00430 <br />Section 00520 <br />Section 00550 <br />Section 00610 <br />Section 00620 <br /> <br />Section 00680 <br />Section 00700 <br />Section 00800 <br /> <br />Technical Specifications <br />Drawings <br /> <br />Subcontractors List Form <br />Agreement <br />Notice to Proceed <br />Faithful Performance Bond <br />Construction Labor and Material <br />Payment Bond <br />Escrow Agreement <br />General Conditions <br />Special Conditions <br /> <br />Listed in the Table of Contents. <br />Listed in the Table of Contents <br /> <br />B. There are no Contract Documents other than those listed above in this Part <br />VI. The geotechnical, existing conditions and other information supplied <br />under Part 6.26 of Document 00700 (General Conditions) is not part of the <br />Contract Documents. The Contract Documents may only be amended, <br />modified or supplemented as provided in Document 00700 (General <br />Conditions). <br /> <br />3 <br />