Laserfiche WebLink
<br />8e <br />Page 40 <br /> <br />Size <br />24 inches <br />20 inches <br />18 inches <br />16 inches <br />14 inches <br />12 inches <br />10 inches <br />8 inches <br />6 inches <br />4 inches <br />3 inches <br />2 inches <br />Total: <br /> <br />Miles <br />2.3 <br />1.8 <br />1.4 <br />11.9 <br />0.7 <br />28.7 <br />8.2 <br />86.9 <br />84.1 <br />19.2 <br />0.3 <br />19.0 <br />264.5 <br /> <br />Source: City of Redwood City - Public Works Services Department. <br /> <br />Water Quality and Environmental Issues and Regulatory Requirements <br /> <br />Monitoring of the imported Hetch Hetchy supply is conducted by the San Francisco <br />Public Utility Commission ("SFPUC"). The SFPUC treats the Hetch Hetchy supply by lime <br />addition at Rock River for corrosion control and chloramination at Tesla Portal for disinfection, <br />but does not filter prior to delivery. Say Area reservoir waters receive complete treatment of <br />filtration and disinfection at either the Sunol or the Harry Tracy filtration plants of the Regional <br />Water System. Filtered water from these treatment plants may be co-mingled with unfiltered <br />Hetch Hetchy water in Bay Area transmission pipelines. The SFPUC and the agencies that <br />serve water from the SFPUC Hetch Hetchy supply previously applied for and were granted <br />filtration avoidance for that supply under the Federal regulations. <br /> <br />The City routinely monitors and conducts tests relating to water quality within the <br />distribution system. The water quality currently meets all primary and secondary drinking water <br />standards. <br /> <br />Capital Improvement Program <br /> <br />The City's projected capital improvement plan for the Enterprise for Fiscal Year 2006-07 <br />through Fiscal Year 2009-10 is set forth below. The City intends to fund its capital improvement <br />plan through fund equity, current revenues and bond proceeds. <br /> <br />Through Fiscal Year 2005-06, the City had capital outlays of $26,090,011 and <br />encumbered $7,296,672 of Recycled Water Project. Additionally, the City expensed or <br />committed $900,000 for its water conservation program in Fiscal Year 2005-06. <br /> <br />25 <br />