My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-04-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2007 4:03:52 PM
Creation date
4/19/2007 2:00:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
4/23/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8e <br />Page 45 <br /> <br />Connection and Facilities Fees. The following table sets forth the current Water System <br />schedule of connection and facilities fees for the Enterprise, which was approved in 1994. <br /> <br />Table 8 <br />Current Connection and Facilities Fees <br /> <br /> Meter Service Line Water <br /> Installation Installation Facilities <br />Meter Size Fee Fee Fee <br /> 5/8 inch $150.00 $2,250.00 $1,787.00 <br /> 3/4 inch 175.00 2,250.00 2,680.50 <br /> 1 inch 200.00 2,250.00 4,467.50 <br />1-1/2 inch 350.00 3,300.00 8,935.00 <br /> 2 inch 450.00 3,300.00 14,296.00 <br /> 3 inch 725.00 TBD-per 26,805.00 <br /> detailed <br /> estimate <br /> 4 inch 1,400.00 TBD-per 44,675.00 <br /> detailed <br /> estimate <br /> 6 inch TBD-per TBD-per 89,350.00 <br /> detailed detailed <br /> estimate estimate <br />Source: City of Redwood City - Public Works Services Department. <br /> <br />The City is currently developing a new water capacity charge that is intended to be <br />added to the existing schedule of water connection and facilities fees. The new charge is <br />expected to be designed so that new development pays its proportionate share of infrastructure <br />costs, including that associated with the Recycled Water Program. City Council consideration <br />of the proposed water capacity charge is anticipated to occur in calendar year 2007. See Table <br />16 under the caption "ENTERPRISE FINANCIAL INFORMATION - Enterprise Historical and <br />Projected Operating Results" below. <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.