My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-04-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2007 4:03:52 PM
Creation date
4/19/2007 2:00:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
4/23/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table A-1 <br />Redwood City Water Financing Plan <br />Policy Assumptions <br /> <br />Policy A.ssumptions <br /> <br />1 Redwood City has overdrafted its potable water supply assurance from SFPUC in recent years and <br />faces long-term water reliability deficits, especially during periods of drought. <br /> <br />2 Redwood City has historically been able to purchase adequate supply from SFPUC to meet full <br />demand, including demand in excess of its supply assurance, due to the temporary availability of <br />excess SFPUC supply. This excess supply is temporarily avaiiable because other BAWSCA <br />agencies are not currently purchasing their full supply assurances. However, in future years the <br />potable water purchases are projected to be below the supply assurance, primarily due to the <br />implementation of an aggressive water conservation program and the construction of a recycled <br />water system. <br /> <br />3 Redwood City has funded an aggressive water conservation program of $4.1 million through the <br />water rates, with the goal of reducing potable water purchases from SFPUC in the amount of 632 <br />AF/Yr. <br /> <br />4 Together, the City's water conservation program and recycled water project will help 1) resolve <br />existing reliability and supply deficiencies, 2) provide additional water supply to meet the needs of <br />growth, and 3) minimize the potential for financial penalties for overdrafting the City's supply <br />assurance when excess SFPUC supply is no longer available or during periods of drought. <br /> <br />5 The Financing Plan makes no assumptions about revenues from new Water Capacity Charges or <br />adjustments to Facilities Fees charged to new connections, and therefore the full burden of <br />constructing the recycled water system, including debt service on bonds is 100% loaded into the <br />water rates. <br /> <br />6 Redwood City is implementing Phase 1 of recycled water project Alternative 'IF'. Phase 1 of the <br />project is projected to cost $72.3 million and includes a recycled water distribution system serving <br />areas east of Highway 101. Cost estimates for each component of the project account for cost <br />inflation to construction date and include contingency allowances. Phase 2, if eventually built, will <br />extend the distribution system west of Highway 101 at an estimated cost of $12.8 million. <br /> <br />7 The recycled water project will reduce potable demand as irrigation and industrial customers switch <br />from potable to recycled water supply. This will free up potable supply to improve reliability for <br />existing and future customers, and provide water supply for new development. To ensure equity <br />between current and future water customers, the City is planning to implement a Water Capacity <br />Fee, Oil the basis of projected water use by new customers to ensure the fees recover the cost of <br /> <br />8 Recycled water rates will be discounted and will not be subject to drought rate increases. The <br />Council considered the pricing policy for recycled water carefully, and in the context of the adopted <br />policy of no mandatory connection requirements, decided to ensure that sufficient voluntary <br />connections are achieved pursuant to approved project Alternative 'IF' (see Appendix B). <br /> <br />9 Redwood City is implementing a very proactive program to prepare sites and users for successful <br />long-term use of recycled water, in full compliance with all federal, state and city safety regulations <br />and policies. <br />10 A single family residential customer who completes a remodeling project may be required to install <br />a larger meter size due to fire service requirements, even if the customer's water demand does not <br />increase. Additional Facility Fees should be collected for actual increases in water demand, but not <br />for mandatory meter upsizing due to fire flow requirements. The City anticipates adopting a policy 1 <br />deal with this issue based on addITional analysis. <br /> <br />BARTLE WELLS ASSOCIATES <br />F:\Jobs\Redwood City\ 1921\ \Water Financial Plan Update 2007 FlAssumptions 1,4/12/2007,6:52 PM <br /> <br />8e <br />Page 102 <br /> <br />Attachment 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.