Laserfiche WebLink
I �c-l� <br /> A'TTACHMENT 8 - . <br /> Parkin¢ Facilitv Costs <br /> The "Pazking Facility Costs" shall be deteimined as follows: <br /> All costs related to the underground pazking including planning, design, engineering, <br /> construcrion management, mapping, and construction costs (based on lowest responsive and <br /> responsible bids to developer) minus the estimated costs for a standard foundation under the <br /> retaiUcinema building including design, engineering, and construction costs. <br /> The "Pazking Facility Costs" shall be determined by using the following formula: <br /> Total construction cost (based on lowest responsive and responsible bids to developer) <br /> Plus Arclutectural and engineering fees <br /> Plus Geotechnicalfees <br /> Plus Building Permit fees <br /> Plus Subdivision Map fees <br /> Plus Survey fees <br /> Plus Construction Management costs <br /> Plus Testing and Inspecrion costs <br /> Minus Construction cost for standazd foundation under RetaiUCinema building <br /> Minus Architectural and engineering design fees for the standazd foundation <br /> Equals "Pazking Structure Purchase Price" <br /> DOCSSF1:648942.4 <br /> 9975-5 C I4 <br />