EXHIBIT `B" <br />Construction and Installation Obli atg ions <br />Timeframe for Installation: Fixed Photo Red Light S s <br />Redflex will have each specified intersection installed and activated in phases in <br />accordance with an implementation plan to be mutually agreed to by Redflex Traffic <br />Systems and the Customer. <br />Redflex will use reasonable commercial efforts to install the system in accordance with <br />the schedule set forth in the implementation plan that will be formalized upon project <br />commencement. <br />Redflex will use reasonable commercial efforts to install and activate the first specified <br />intersection within forty-five (45) to sixty (60) calendar days subsequent to formal project <br />kick-off. The Customer agrees that the estimated timeframe for installation and activation <br />are subject to conditions beyond the control of Redflex and are not guaranteed. <br />In order to provide the Customer with timely completion of the photo enforcement <br />project Redflex Traffic Systems requires that the Customer assist with providing timely <br />approval of City permit requests. The Customer acknowledges the importance of the <br />safety program and undertakes that in order to keep the project on schedule the customer <br />is to provide city engineers review of Redflex permit requests and all documentation in a <br />timely manner. <br />Redflex Obligations. Redflex shall do or cause to be done each of the following (in <br />each case, unless otherwise stated below, at Redflex's sole expense): <br />l.l. Appoint the Redflex Project Manager and a project implementation team <br />consisting of between one (1) and four (4) people to assist the Redflex Project <br />Manager; <br />1.2. Request current "as-built" electronic engineering drawings for the Designated <br />Intersection Approaches (the "Drawings") from the city traffic engineer; <br />1.3. Develop and submit to the Customer for approval construction and installation <br />specifications in reasonable detail for the Designated Intersection Approaches, <br />including but not limited to specifications for all radar sensors, pavement loops, <br />electrical connections and traffic controller connections, as required; and <br />1.4. Seek approval from the relevant Governmental Authorities having authority or <br />jurisdiction over the construction and installation specifications for the <br />Designated Intersection Approaches (collectively, the "Approvals"), which will <br />include compliance with City permit applications. <br />1.5. Finalize the acquisition of the Approvals; <br />1.6. Submit to the Customer a public awareness strategy for the Customer's <br />consideration and approval, which strategy shall include media and educational <br />materials for the Customer's approval or amendment (the "Awareness Strategy"); <br />1.7. Develop the Redlight Violation Criteria in consultation with the Customer; <br />1.8. Develop the Enforcement Documentation for approval by the Customer, which <br />approval shall not be unreasonably withheld; <br />21 <br />