My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-06-04
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2007 5:02:28 PM
Creation date
5/31/2007 1:56:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
6/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REPORT <br />To the Honorable Mayor and City Council <br />Frorn the City Manager <br />June 4, 2007 <br />SUBJECT <br />Water Capacity Charge to support increased reliability of the water supply <br />RECOMMENDATION <br />Staff recommends that the Council: {1) approve, by resolution, the amendment of <br />Attachment Q to the Engineering Standards for the City; and (2) introduce an Ordinance <br />to establish a Water Capacity Charge, which requires amendment of the City <br />Ordinance, Chapter 38, Wafer System Regulations, to add Section 38.15, Water <br />Capacity Charge. <br />BACKGROUND <br />The key points regarding the Water Capacity Charge are summarized below: <br />• Currently the City's water demand exceeds the water supply assurance from the <br />San Francisco Regional Water System. <br />• Phase One of the Project (recommendations from the Recycled Water Task <br />Force -recycled water implementation and synthetic field conversion) is funded <br />through approximately $72 million in revenue bonds. <br />The bonds are being repaid through water rates because the band holders <br />require a predictable revenue source. <br />• This payment arrangement creates inequity since new <br />developments/connections will not pay their fair share, but will benefit from the <br />increased water supply assurance. <br />• The purpose of the proposed Water Capacity Charge is to fairly distribute the <br />cost of providing increased water supply reliability to new <br />developments/connections. <br />• The proposed rate for the Water Capacity Charge is considered at the lower <br />range of possible rates because only the cost of phase one of the recycled water <br />project is divided by the overall maximum production capability. <br />• The charge calculation is based on the projected water demand of new <br />connections as derived from factors in the revised Attachment Q of the <br />Engineering Standards. <br />• Revisions to Attachment Q are limited to the residential water use projection, and <br />are consistent with the 2006 Nexus Study based on the 2000 census data by the <br />City's Parks, Recreation and Community Services Department. <br />!n January 2002, the City Council set broad community priorities including addressing <br />water supply assurance by eliminating San Francisco Regiona! Water System <br />contractual supply assurance overdraft by 2010, implementing a water recycling project, <br />and continuing aggressive water conservation efforts. <br />In 2004, after an extended process of community involvement, the City Council adopted <br />the Project alternative recommended by the Community Task Force on Recycled Water. <br />This Project, which includes both facilities for production and distribution of recycled <br />water and replacemen# of grass at athletic fields with synthetic turf, is currently <br />underway. It has been funded through the issuance of approximately $72 million in <br />revenue bonds authorized by the City Council in 2006. Because paying the debt <br />7A <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.