Laserfiche WebLink
<br />Form Approved, A VP Law <br />Updated 07/2006 <br /> <br />EXHIBIT B <br /> <br />Section 1. <br /> <br />LIMITATION AND SUBORDINATION OF RIGHTS GRANTED. <br /> <br />A. The foregoing grant of right is subject and subordinate to the prior and continuing right and <br />obligation of the Licensor to use and maintain its entire property including the right and power of <br />the Licensor to construct, maintain, repair, renew, use, operate, change, modify or relocate <br />railroad tracks, signal, communication, fiber optics, or other wire lines, pipelines and other <br />facilities upon, along or across any or all parts of its property, all or any of which may be freely <br />done at any time or times by the Licensor without liability to the Licensee or to any other party <br />for compensation or damages. <br /> <br />B. The foregoing grant is also subject to all outstanding superior rights (including those in favor of <br />licensees and lessees of the Licensor's property, and others) and the right ofthe Licensor to renew <br />and extend the same, and is made without covenant of title or for quiet enjoyment. <br /> <br />Section 2. <br /> <br />CONSTRUCTION. MAINTENANCE AND OPERATION. <br /> <br />A. The Pipeline shall be constructed, operated, maintained, repaired, renewed, modified and/or <br />reconstructed by the Licensee in strict conformity with (i) Licensor's current standards and <br />specifications ("UP Specifications"), except for variances approved in advance in writing by the <br />Licensor's Assistant Vice President Engineering - Design, or his authorized representative; (ii) <br />such other additional safety standards as the Licensor, in its sole discretion, elects to require, <br />including, without limitation, American Railway Engineering and Maintenance-of-Way <br />Association ("AREMA") standards and guidelines (collectively, "UP Additional Requirements"), <br />and (iii) all applicable laws, rules and regulations ("Laws"). If there is any conflict between the <br />requirements of any Law and the UP Specifications or the UP Additional Requirements, the most <br />restrictive will apply. <br /> <br />B. All work performed on property of the Licensor in connection with the construction, <br />maintenance, repair, renewal, modification or reconstruction of the Pipeline shall be done to the <br />satisfaction of the Licensor. <br /> <br />C. Prior to the commencement of any work in connection with the construction, maintenance, repair, <br />renewal, modification, relocation, reconstruction or removal of the Pipeline where it passes <br />underneath the roadbed and track or tracks of the Licensor, the Licensee shall submit to the <br />Licensor plans setting out the method and manner of handling the work, including the shoring and <br />cribbing, if any, required to protect the Licensor's operations, and shall not proceed with the work <br />until such plans have been approved by the Licensor's Assistant Vice President Engineering <br />Design, or his authorized representative, and then the work shall be done to the satisfaction of the <br />Licensor's Assistant Vice President Engineering Design or his authorized representative. The <br />Licensor shall have the right, if it so elects, to provide such support as it may deem necessary for <br /> <br />