My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. East Bayshore Road Plan and Profile (4 sheets) <br />7. Blomquist Street Plan and Profile (5 sheets) <br />t <br />8. Branch Pipelines (4 sheets) <br />9. Miscellaneous Details (6 sheets) <br />BID PACKAGE 8 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Redwood Creek Crossing Plan and Profile (6 sheets) <br />7. Structural Drawings - Not Included <br />8. Miscellaneous Details (6 sheets) <br />BID PACKAGE 9 <br />1. Vicinity Map, Location Map and Index to Drawings <br />2. Abbreviations and General Notes <br />3. Legend and Symbols <br />4. Sheet Layout <br />5. Horizontal Alignment Tables & Table of Monuments to Replace <br />6. Bridge Parkway Plan and Profile (9 sheets) <br />7. Island Parkway Plan and Profile (3 sheets) <br />8. Miscellaneous Details (6 sheets) <br />PROJECT SCHEDULE <br /> <br />Upon City's separate notice to proceed, Consultant shall complete design work under Tasks 1-4 <br />in 9 months. It is understood that Bid Packages 6 and 7 will be designed concurrently, with Bid <br />Packages 8 and 9 to follow. Bidding support services will be performed over a 2-month period <br />for each bid package, and construction support services will be performed over an 8-month <br />period for each bid package. The following schedule milestones are anticipated: <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.