My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2007 11:38:58 AM
Creation date
7/11/2007 3:56:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Agmt for Professional Engineering Svc, Recycled Water Project - Phase 1 - Distribution System Design, Bay Front, Seaport, and Westport Project Area
RMP File Number
304
Date
7/9/2007
MO Ref
07-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Bidding and Construction Support <br /> <br />$75,600 <br />$71,000 <br />$20,900 <br />$37,600 <br />$234,000 <br /> <br />Preliminary Design <br /> <br />90 Percent Design <br /> <br />Final Design <br /> <br />Bid Package 7 Subtotl:\,1: <br /> <br />Bid Package 8 <br /> <br />90 Percent Design <br /> <br />$28,900 <br />$58,600 <br />$48,700 <br />$18,800 <br />$31.300 <br /> <br />Project Management <br /> <br />Preliminary Design <br /> <br />Final Design <br /> <br />Bidding and Construction Support <br /> <br />Bid Package 8 Subtotal: <br /> <br />$186,300 <br /> <br />Bid Package 9 <br /> <br />Final Design <br /> <br />$30,000 <br />$41,200 <br />$63,700 <br />$21,600 <br /> <br />Project Management <br /> <br />Preliminary Design <br /> <br />90 Percent Design <br /> <br />Bidding and Construction Support <br /> <br />$38,600 <br />$195,100 <br /> <br />Bid Package 9 Subtotal: <br /> <br />Highway 101 Bike Path Pipeline Improvements <br /> <br />Evaluate Required Improvements: <br /> <br />$7,000 <br />$14,500 <br /> <br />90 Percent Design <br /> <br />Final Design <br /> <br />$8.600 <br /> <br />Highway 101 Bike Path Pipeline Subtotal: <br /> <br />$30,100 <br /> <br />Bid Packages 1 to 5 Record Drawings and GIS Conversion <br /> <br />Agreement over $lOK 35 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.