Laserfiche WebLink
<br />Sequoia Hospital <br />Environmental Impact Report (EIR) <br /> <br />All significant impacts identified in the Draft EIR (transportation, noise, air <br />quality (during construction), biological resources and hydrology and water <br />quality) can be reduced to less than significant impacts with proposed <br />mitigation measures, except for the following transportation impacts: <br /> <br />. Three significant unavoidable roadway intersection impacts remain: <br />1. Alamenda de las Pulgas and Edgewood Road <br />2. 1-280 Northbound Ramp and Edgewood Road and <br />3. EI Camino Real and Whipple Avenue - 5.1 seconds delay, LOS E <br />. Sequoia to install an Emergency Vehicle Pre-Emption System at signal to <br />reduce emergency vehicle delays. <br />. Sequoia to pay 'fair share' contribution to new receiving lane to allow a <br />"free" westbound right turn from Whipple to northbound EI Camino. This will <br />mitigate the project impact in the PM peak hour but is subject to Caltrans <br />approval and so mitigation is not assured. <br />