<br />6.1E <br /> <br />Customer Site Retrofit package (Retrofit Bid Package 1) for 18 commercial sites Page 2 <br />in the Redwood Shores area are under construction for the 2007 irrigation <br />season. Construction is 70% completed. <br /> <br />This pipeline construction project (Bid Package 5 - see attached map) is the fifth <br />distribution system project designed to extend the delivery of recyded water to the <br />Seaport area. The completion of Bid 4 construction at the end of 2007 and the <br />beginning of Bid 5 construction marks an important milestone in the Recycled Water <br />Transmission System component of the project as recyded water services in Redwood <br />Shores commence, and delivery of recyded water to commercial and industrial <br />customers in the Bay Front and Seaport areas become the primary focus. This project <br />consists of the installation of the main transmission piping system in Seaport <br />Distribution System along Seaport Boulevard, Seaport Court, Chesapeake Drive & <br />Herkner Road. More than 8,000 linear feet of PVC pipe ranging in size from 8 to 14 <br />inches in diameter, will be constructed in approximately eight months. <br /> <br />The 11 bids received at the bid opening on July 25, 2007, are summarized below: <br /> <br />No. Bidder Bid Amount <br />1. Shaw Pipeline, Inc.. San Francisco $2.104,800.00 <br />2. o W Youna Construction, Alamo $2 252,465.00 <br />3. Ranger Pipelines. San Francisco $2419,680.00 <br />4. KJ Woods. San Francisco $2474,000.00 <br />5. Mitchell Enaineerina. San Francisco $2,590,250.00 <br />6. Marques Pipeline, Inc., Sacramento $2,599,350.00 <br />7. Pacific Underaround Construction. Jnc.. San Jose $2751,260.00 <br />8. JMB Construction, Inc., South San Francisco $2 791.500.00 <br />9. Mountain Cascade, Inc., Livermore $2,858,875.00 <br />10. Precision Engineerina. Inc.. San Francisco $2987.700.00 <br />11. West Vallev Construction Company, Inc. San Jose $3,821,115.00 <br /> <br />The low bid of $2,104,800.00 from Shaw Pipeline, Inc. is 25% lower than the Engineer's <br />estimate of $2.8 million for the cost of construction. Based upon the bids received, staff <br />believes that the low bid of $2,104,800.00 is reasonable and responsive, and <br />recommends awarding the contract to Shaw Pipeline, Inc. <br /> <br />ALTERNATIVES <br />Do not award the contract for the Redwood City Recyded Water Project - Phase I - <br />Seaport Distribution System - Bid Package 5 (Seaport Boulevard, Seaport Court, <br />Chesapeake Drive & Herkner Road) Project, which would be contrary to prior Council <br />action. <br /> <br />FISCAL IMPACT <br /> <br />Funds for the proposed construction contract are available from the Water Revenue <br />Bond. proceeds. The City has issued a series of three Water Revenue Bonds to finance <br />Phase 1 of the Recycled Water Project. Available project funds, less unattributed <br />interest, total $18,053,802 as of June 30,2007. <br />