My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 West Valley Construction, Co -cut & cap two 4' svc laterals, 300-400 block Marine Pkwy, RWC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 West Valley Construction, Co -cut & cap two 4' svc laterals, 300-400 block Marine Pkwy, RWC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2007 8:34:36 AM
Creation date
8/17/2007 8:34:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
West Vally Construction Co.
PROJECT NAME
cut & cap two 4" service laterals, 300-400 block Marine PKWY, RWC
Date
8/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br /> <br />SCOPE OF SERVICES <br /> <br />Contractor will supply all necessary tools, equipment, and materials necessary to <br />excavate, cut, and cap, two (2) 4" water service laterals. Work shall include the <br />backfilling, compaction, and paving of excavated areas while performing above said <br />work. <br /> <br />Contractor will also provide all necessary tools, equipment, and materials necessary to <br />properly and legally mitigate traffic while performing above said work. Contractor shall <br />provide adequate warning and construction signs at the construction site. Additional <br />signs for the convenience of the public shall be maintained as directed by the City. <br /> <br />Work is to be performed at two (2) separate locations on Marine Parkway in Redwood <br />City, CA, as agreed, during site visit that ensued on July 17, 2007. <br /> <br />All work shall be performed according to City specifications and standards including, but <br />not limited to: <br /> <br />Section 02500 - Asphalt Paving and Surfacing <br />Section 02660 - Water Systems <br /> <br />All excess materials and debris shall be removed and disposed of by contractor. <br />Contractor shall leave work areas neat and clean upon completion of all work. <br /> <br />Page 9 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.