My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt07 The Huffman-Broadway Group, Inc. - Environmental regulatory consulting services
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Under $60K
>
Agmt07 The Huffman-Broadway Group, Inc. - Environmental regulatory consulting services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2007 8:43:31 AM
Creation date
8/17/2007 8:43:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
The Huffman-Broadway Group, Inc.
PROJECT NAME
Environmental Regulatory Consulting Services
Date
8/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT fr <br /> <br />ATTORNEY WORK PRODUCT - PROPRIETARY AND CONFIDENTIAL <br /> <br />SCOPE OF WORK <br /> <br />Assistance with Corps and U.S. Fish and Wildlife <br />Regulatory Issues Involving Redwood Shores and Bair Island Access; <br />City of Redwood City, California <br /> <br />I. Backaround; <br /> <br />A number of species have been listed as threatened or endangered and critical habitat has been <br />designated under the Endangered Species Act (ESA). The ESA prohibits actions that "take" <br />(harm, injure, trap, harass, etc.) listed species. Where federal actions are needed (e.g., federal <br />permits) , a Section 7 consultation is required to ensure that the action is not likely to jeopardize <br />the survival of such species or adversely modify designated critical habitat. If "take" may occur, <br />this process results in an incidental take statement (authorizing take) and identifying mitigation <br />measures. Several listed species and critical habitat in the vicinity of the City create uncertainty <br />as to future development and, without planning and cooperation of the U.S. Fish & Wildlife <br />Service (FWS), can prevent if not retard desirable development within or adjacent to the City, <br />particularly Bair Island and Redwood Shores Peninsula. <br /> <br />Many projects are planned for the Redwood Shores Peninsula, including Area H development, <br />the South Bayside System Authority levee modification, culvert repair, bridge access to Bair <br />Island and restoration oflevee access. Many, but not all, of these plans can be completed under <br />a current Corps of Engineers permit. However, the extant Section 7 consultation and incidental <br />take statement for the existing Corps permit will be reopened and the FWS may consider <br />cumulative effects to species and habitat. The result is uncertainty regarding needed and <br />desirable development within the City limits and uncertainty with regard to overall future <br />recovery of listed species. Therefore, it is in the mutual interest of both the City and the FWS to <br />consult and coordinate to achieve respective goals and objectives. <br /> <br />We believe the mutual goals and interests of the City and FWS can be achieved by entering into <br />a Memorandum of Understanding (MOD) with the FWS to authorize, direct and control future <br />development of Redwood Shores Peninsula development and modifications (levee, culvert, <br />bridge access). The City has the inherent power to enter into an MOU and the FWS has been <br />promoting MOU's as a means to achieve general certainty with regard to future development and <br />protection oflisted species. The City could enter into direct negotiations with the FWS for a <br />general plan of future development and treatment of the Redwood Shores Peninsula. If an MOU <br />is developed that is attractive to the City, the City could adopt the MOU or relevant portions of <br />the MOU as part the Land Use Element policies and goals (e.g. public access, environmental <br />amenities, sustainability, levee maintenance, etc.) in the General Plan. Chief among some of the <br />City's general goals would be achieving levee maintenance and levee trail access. The benefit for <br />the FWS is that it can rely on the General Plan to assure that future development will be <br />consistent with the MOD. The benefit for the City is that rather than await a decision by the <br />FWS on a request to modify the prior biological opinion, the MOU negotiations is the joint <br />product of the two parties. By using the General Plan and the City's planning authority the <br /> <br />C:\Documents and Settings\malcolmsmith\Local Settings\Ternporary Internet Files\OLKI OC\ProposaI4-23-2007 (2).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.