My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-08-27
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-08-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:59:10 PM
Creation date
8/23/2007 2:26:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/27/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br /> Page 53 <br /> Sequoia Hospital Draft ElR <br /> A[1 significant impacts identified in the Draft EIR (transpartation, noise, air quality (during <br /> Ci�nstr�.��tin�l, k�i�lc�i��l resQUrces �nd hvc�rc�Ic_sav �nd water c�u�lity) c�n kae rPCiticeci tc� <br /> less than siqnificant impac#s with proposed mitigation measures, except for the following <br /> transportation impacts: <br /> ■ Three significant unavo+dable roadway intersection impacts remain: <br /> 1. Alameda de las Pukgas and Edgewood Road <br /> 2. I-280 Northbound ramp and Edgewood Road and <br /> 3. EI Camino Rea€ and Whipple Avenue—5.1 secor�ds�elay, LOS E <br /> • Sequoia to install an Emergency Vehicle Pre-E��t�n System at signa! to <br /> rsduce emergency vehicle delavs <br /> • Sequoia to pay `fair share' contributian to r�ev�r receiving lane to alfow a <br /> "free" westbound right turn from Whip;1��to n`ort�bound Ef Camino. This <br /> �':.. <br /> wilf mi#iga#e the praject impacf in the�;PM peak hour but is subject to <br /> Caltrans approval and so mitigafia�'��s:�ot'�Nassured :� <br /> ,... ,� <br /> ■ Other transportation-Reiated Condition���f Approv� <br /> -Alameda de las Pulgas and. '`F��pple Aven�e.- ' � <br /> Sequoia wil[fuRy fund and constructa ng,k,��ui�r��over{ap on �estbound <br /> approach to northbound Alameda (� e �r�en arrow wiA allow right turns <br /> fram west bound Vlf ipple north bound ���t�eda when there is a green <br /> arrow for left turn m�rre�inents on Alameda� <br /> • Construction truck Traffic Roadway Iriip�c��o Whipple Avenue— <br /> - Engineering staff recommends that Se�},u,oia �ay for two roadway slurry <br /> :,.. <br /> seafs over qext 4-6 years, sin�e roadway:�+vear and tear is hard to quantify. <br /> �:. <br /> Sequoia Hos �a1 Final��t#�;& Draft Pre`c�se Plan <br /> ', a,., <br /> Final Envirc����i#al Impact�Report: <br /> ❖ Inc(uc�e��r�spo�ses to all Planni�t,g Commission and public input on the Draft <br /> : <br /> in e x a �.,� en -sn <br /> �ir` F�'�i��tG�itl�����'S::�G'kt CF�;,���ycS, NaycS v�-�v. <br /> •~' �t?�'}�W SI �� <br /> �::., <br /> .: grtt�t�ant envirartm�ntal impacts were identified as a result of public <br /> ::. <br /> ,, <br /> � � <br /> .: . inp� � � :. <br /> �Draft Precise P ar� - <br /> y •;• Includes���ponses�o'al! Planning Commission and public input. <br /> ' : R�f�r to _'�e�f & R�raphic changes in Planning �ommission staff r�p�rt <br /> ,: Memorandurn, Tables I 8 !I, from Bruce Fukuji ta Maureen Riordan, dated <br /> :' :May 25 and July 2, 2Q07. <br /> � � <br /> Community Qt�tr��ch <br /> Citv-Sponsored-Piabfic Meetings & Hearinqs: <br /> •3 1/1�/Q5 — Presentation to owners / tenants of 2900, 2940 & 2950 Whippie <br /> Avenue to discuss inclusion in#o the Sequaia Hospital Precise Plan <br /> •:• 2/10/05— Community Scoping Meeting {CEQA) <br /> •:• 2/17/Q5 — Joint S#udy Session of the Architectural Review Committee (ARC} <br /> & Planning Commissian (PC} to review concept plan <br /> :• 1/06 —ARC meeting to provide architectural input <br /> �:• 5/9/06—Jaint Study Session of ARC & PC on revised concept plan <br /> •:• 2/33la7—ARC recommends approvaf of hospital & parking structure design <br /> •:• 4/17/07— Public Hearing before PC on Draft EIR and Precise Plan <br /> Ci�Website Postings— Project (EIR, Precise Pfan, etc) postings beginning on 3l06 <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.