Agmt07 Shaw Pipeline, Inc. - RWC recycled water project - Phase 1, Seaport distribution system Bid Package 5
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2007
>
Agmt07 Shaw Pipeline, Inc. - RWC recycled water project - Phase 1, Seaport distribution system Bid Package 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 4:00:43 PM
Creation date
8/29/2007 8:27:43 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Shaw Pipeline, Inc.
PROJECT NAME
Redwood City Recycled water project - phase 1, Seaport distribution system Bid package 5 (Seaport Blvd, Seaport Ct, Chesapeake Dr. and Herkner Rd.
RMP File Number
304
Date
8/27/2007
MO Ref
07-148 08-187
Box
7062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />B. Liquidated Damaqes <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financial loss in the form of lost revenues, contract <br />administration expenses (including project management and consultants' <br />expenses), delay and loss of public use, if the Work is not completed within <br />the time specified in paragraph 1I1.A.1 above plus any extensions thereof <br />allowed in accordance with the Contract Sections. Consistent with Section <br />00700 (General Conditions), Contractor and City agree that because of the <br />nature of the Project, it would be impractical or extremely difficult to fix the <br />amount of actual damages incurred by City because of a delay in completion <br />of the Work. <br /> <br />2. Accordingly, City and Contractor agree that Contractor shall pay City five <br />thousand and no/100th dollars ($5,000) for each Day that expires after the <br />time specified in Paragraph 1I1.A.1 of this Section 00520 for Contractor to <br />achieve Substantial Completion, until such date as contractor achieves <br />Substantial Completion. <br /> <br />C. Liquidated damages for delay shall only cover and be in lieu of the actual damages <br />suffered by City as a result of delay referenced above. Liquidated damages shall not <br />cover the cost of completion of the Work, damages resulting from defective work, <br />cost of temporary replacement facilities, damages suffered by others who then seek <br />to recover their damages from City (for example, delay claims of other contractors or <br />subcontractors), and defense costs thereof. <br /> <br />IV. CITY'S ENGINEER AND REPRESENTATIVES <br />Reserved <br /> <br />V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br /> <br />A. Contractor has visited the Site and has examined thoroughly and understood the <br />nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br />and all local conditions and federal, state and local laws and regulations that in any <br />manner may affect cost, progress, performance or furnishing of Work or which <br />relate to any aspect of the design and the means, methods, techniques, sequences <br />or procedures of construction to be employed by Contractor and safety precautions <br />and programs incident thereto. <br /> <br />B. Contractor has examined thoroughly and understood all reports of exploration and <br />tests of subsurface conditions, drawings or reports, available for design and <br />construction purposes, of physical conditions, or which may be apparent at the Site <br />and accepts the determination set forth in these Sections and Section 00700 <br />(General Conditions) of the limited extent of the information contained in these <br />Sections upon which the Contractor may be entitled to rely. Contractor agrees that <br />except for the information so identified, Contractor does not and shall not rely on <br />any other information contained in these Sections. <br /> <br />C. Contractor has considered the physical conditions at or contiguous to the Site or <br />otherwise which may affect the cost, progress, performance or furnishing of Work, <br />as Contractor considers necessary for the performance or furnishing of Work at the <br />Contract Sum, within the Contract Time and in accordance with the other terms and <br />conditions of Contract Sections, including specifically the provisions of the (General <br />Conditions) . <br /> <br />AGREEMENT <br />SEAPORT RECYCLED WATER DISTRIBUTION SYSTEM, BID PACKAGE 5 <br /> <br />00520-2 <br />